Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
7 CFR Part 1780, Subpart C—Planning, Designing, Bidding, Contracting, Constructing and Inspections
7 CFR Part 1780, Subpart C—Planning, Designing, Bidding, Contracting, Constructing and Inspections, “Planning, Designing, Bidding, Contracting, Constructing and Inspections”, is a CFR division of 7 CFR Part 1780—Water and waste loans and grants.
https://ontology.bommaritollc.com/id/01a0ee02-06f7-7040-bfd3-87885f4f1b57
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 7 CFR Part 1780, Subpart C |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Planning, Designing, Bidding, Contracting, Constructing and Inspectionsen |
| skos:prefLabel | 7 CFR Part 1780, Subpart C—Planning, Designing, Bidding, Contracting, Constructing and Inspectionsen |
Related
Parts (21)schema:isPartOf
- 7 CFR 1780.53 General.
- 7 CFR 1780.54 Technical services.
- 7 CFR 1780.55 Preliminary engineering reports and environmental review documentation.
- 7 CFR 1780.56
- 7 CFR 1780.57 Design policies.
- 7 CFR 1780.58-1780.60
- 7 CFR 1780.61 Construction contracts.
- 7 CFR 1780.62 Utility purchase contracts.
- 7 CFR 1780.63 Sewage treatment and bulk water sales contracts.
- 7 CFR 1780.64-1780.66
- 7 CFR 1780.67 Performing construction.
- 7 CFR 1780.68 Owner's contractual responsibility.
- 7 CFR 1780.69
- 7 CFR 1780.70 Owner's procurement regulations.
- 7 CFR 1780.71
- 7 CFR 1780.72 Procurement methods.
- 7 CFR 1780.73
- 7 CFR 1780.74 Contracts awarded prior to applications.
- 7 CFR 1780.75 Contract provisions.
- 7 CFR 1780.76 Contract administration.
- 7 CFR 1780.77-1780.79