Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
49 CFR Part 240, Subpart C—Implementation of the Certification Process
49 CFR Part 240, Subpart C—Implementation of the Certification Process, “Implementation of the Certification Process”, is a CFR division of 49 CFR Part 240—Qualification and certification of locomotive engineers.
https://ontology.bommaritollc.com/id/01a0ee02-0ad2-762f-9e53-ca31c6df5201
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 49 CFR Part 240, Subpart C |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Implementation of the Certification Processen |
| skos:prefLabel | 49 CFR Part 240, Subpart C—Implementation of the Certification Processen |
Related
Parts (16)schema:isPartOf
- 49 CFR 240.201 Implementation.
- 49 CFR 240.203 Determinations required as a prerequisite to certification.
- 49 CFR 240.205 Procedures for determining eligibility based on prior safety conduct.
- 49 CFR 240.207 Procedures for making the determination on vision and hearing acuity.
- 49 CFR 240.209 Procedures for making the determination on knowledge.
- 49 CFR 240.211 Procedures for making the determination on performance skills.
- 49 CFR 240.213 Procedures for making the determination on completion of training program.
- 49 CFR 240.215 Retaining information supporting determinations.
- 49 CFR 240.217 Time limitations for making determinations.
- 49 CFR 240.219 Denial of certification.
- 49 CFR 240.221 Identification of qualified persons.
- 49 CFR 240.223 Criteria for the certificate.
- 49 CFR 240.225 Reliance on qualification determinations made by other railroads.
- 49 CFR 240.227 Reliance on qualification requirements of other countries.
- 49 CFR 240.229 Requirements for joint operations territory.
- 49 CFR 240.231 Requirements for locomotive engineers unfamiliar with physical characteristics in other than joint operations.