# 7 CFR 51.59 Operations and operating procedures.

7 CFR 51.59 Operations and operating procedures., “Operations and operating procedures”, is a CFR section of [7 CFR Part 51, Subpart A, Subject Group: Requirements for Plants Operating Under Continuous Inspection on a Contract Basis—Requirements for Plants Operating Under Continuous Inspection on a Contract Basis](https://ontology.bommaritollc.com/id/01a0ee01-fe64-775a-8454-e47c5262689e); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6>

Within: [Title 7—Agriculture](https://ontology.bommaritollc.com/id/01a0ee01-fc84-74da-967e-7a886b9d2b1b) › [7 CFR Subtitle B—Regulations of the Department of Agriculture](https://ontology.bommaritollc.com/id/01a0ee01-fd95-756c-ad5b-adf062d88065) › [7 CFR Chapter I—AGRICULTURAL MARKETING SERVICE (STANDARDS, INSPECTIONS, MARKETING PRACTICES), DEPARTMENT OF AGRICULTURE](https://ontology.bommaritollc.com/id/01a0ee01-fd96-71d2-882e-f4bb00d134fb) › [7 CFR Chapter I, Subchapter C—REQUIREMENTS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT](https://ontology.bommaritollc.com/id/01a0ee01-fe5b-7083-94b6-2a718865dce0) › [7 CFR Part 51—Fresh fruits, vegetables, and other products (inspection, certification, and standards)](https://ontology.bommaritollc.com/id/01a0ee02-0d63-71a8-9f69-85bd72d390b2) › [7 CFR Part 51, Subpart A—Requirements](https://ontology.bommaritollc.com/id/01a0ee01-fe5c-756d-b30d-a4b08d6763bc) › [7 CFR Part 51, Subpart A, Subject Group: Requirements for Plants Operating Under Continuous Inspection on a Contract Basis—Requirements for Plants Operating Under Continuous Inspection on a Contract Basis](https://ontology.bommaritollc.com/id/01a0ee01-fe64-775a-8454-e47c5262689e)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 7 CFR 51.59](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-fef98e3f9d21)
- `eli:cites`:
  - [7 CFR 51.59 Operations and operating procedures.](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6)
  - [7 CFR 51.60 Termination of contracts.](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-fefbf5252664)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title7-vol1](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feec72a3cde8)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0ee02-965a-7613-be3f-d97e228f9a21)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0ee05-9632-704d-98b1-e0e86859ebb3)
  - [evidence from https://www.govinfo.gov/link/cfr/7/51?sectionnum=59&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f18-3e9d-7346-a198-ac780e4f8a00)
- `schema:isPartOf`: [7 CFR Part 51, Subpart A, Subject Group: Requirements for Plants Operating Under Continuous Inspection on a Contract Basis—Requirements for Plants Operating Under Continuous Inspection on a Contract Basis](https://ontology.bommaritollc.com/id/01a0ee01-fe64-775a-8454-e47c5262689e)
- `schema:legislationIdentifier`: 7 CFR 51.59
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Operations and operating procedures
- `schema:url`: [https://www.govinfo.gov/link/cfr/7/51?sectionnum=59&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/7/51?sectionnum=59&year=mostrecent&link-type=details)
- `skos:prefLabel`: 7 CFR 51.59 Operations and operating procedures.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/7/51?sectionnum=59&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title7-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (1; `eli:cites`):
  - [7 CFR 51.58 Equipment.](https://ontology.bommaritollc.com/id/01a0ee02-1ce3-7096-9cd4-57ec90e3e316)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6.nt), [HTML](https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6)
Cite as: 7 CFR 51.59 Operations and operating procedures.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0ee02-1ce5-707e-a6d1-feed9a30fee6
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
