Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
49 CFR 178.69 Responsibilities and requirements for manufacturers of UN pressure receptacles.
49 CFR 178.69 Responsibilities and requirements for manufacturers of UN pressure receptacles., “Responsibilities and requirements for manufacturers of UN pressure receptacles”, is a CFR section of 49 CFR Part 178, Subpart C—Specifications for Cylinders; in force.
https://ontology.bommaritollc.com/id/01a0ee02-5faf-705a-b6e5-9607fd50fff6
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 49 CFR 178.69 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Responsibilities and requirements for manufacturers of UN pressure receptaclesen |
| schema:url | |
| skos:prefLabel | 49 CFR 178.69 Responsibilities and requirements for manufacturers of UN pressure receptacles.en |
Related
Cited by (5)eli:cites
- 49 CFR 171.23 Requirements for specific materials and packagings transported under the ICAO Technical Instructions, IMDG Code, Transport Canada TDG Regulations, or the IAEA Regulations.
- 49 CFR 171.6 Control numbers under the Paperwork Reduction Act.
- 49 CFR 178.70 Approval of UN pressure receptacles.
- 49 CFR 178.74 Approval of MEGCs.
- 49 CFR 180.207 Requirements for requalification of UN pressure receptacles.