Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
43 U.S.C. 619 Increase in capacity of existing generating equipment at Hoover Powerplant; construction of Colorado River bridge crossing
43 U.S.C. 619 Increase in capacity of existing generating equipment at Hoover Powerplant; construction of Colorado River bridge crossing, “Increase in capacity of existing generating equipment at Hoover Powerplant; construction of Colorado River bridge…”, is a U.S. Code section of Subchapter III—Hoover Dam Contracts and Facilities; in force.
https://ontology.bommaritollc.com/id/01a0f07d-d467-7350-b33b-87af0537bb4e
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 43 U.S.C. 619 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Increase in capacity of existing generating equipment at Hoover Powerplant; construction of Colorado River bridge crossingen |
| schema:url | |
| skos:prefLabel | 43 U.S.C. 619 Increase in capacity of existing generating equipment at Hoover Powerplant; construction of Colorado River bridge crossingen |
Related
Cited by (8)eli:cites
- 10 CFR 904.10 Excess energy.
- 10 CFR 904.3 Definitions.
- 10 CFR 904.4 Marketing responsibilities.
- 10 CFR 904.5 Revenue requirements.
- 10 CFR 904.7 Base charge.
- 10 CFR 904.8 Lower basin development fund contribution charge.
- 43 U.S.C. 618e Interest payments; rate
- 43 U.S.C. 619b Reimbursement of funds advanced by non-Federal purchasers; uprating program; repayment requirement; visitor facilities program