Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
43 U.S.C. 1552 Criteria for long-range operation of reservoirs
43 U.S.C. 1552 Criteria for long-range operation of reservoirs, “Criteria for long-range operation of reservoirs”, is a U.S. Code section of Subchapter V—General Provisions; in force.
https://ontology.bommaritollc.com/id/01a0f07d-d61c-7592-8ca0-83d3986c46dd
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 43 U.S.C. 1552 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Criteria for long-range operation of reservoirsen |
| schema:url | |
| skos:prefLabel | 43 U.S.C. 1552 Criteria for long-range operation of reservoirsen |
Related
Cited by (2)eli:cites
- 16 U.S.C. 228h Construction with existing Colorado River system reclamation provisions
- 43 U.S.C. 1521 Central Arizona Project