10 CFR 50.10 License required; limited work authorization.
10 CFR 50.10 License required; limited work authorization., “License required; limited work authorization”, is a CFR section of 10 CFR Part 50, Subject Group: Requirement of License, Exceptions—Requirement of License, Exceptions; in force.
https://ontology.bommaritollc.com/id/01a0f08b-907a-70f1-a783-1bddbec04b4d
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 10 CFR 50.10 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | License required; limited work authorizationen |
| schema:url | |
| skos:prefLabel | 10 CFR 50.10 License required; limited work authorization.en |
Related
Cited by (28)eli:cites
- 10 CFR 100.23 Geologic and seismic siting criteria.
- 10 CFR 2.101 Filing of application.
- 10 CFR 2.105 Notice of proposed action.
- 10 CFR 2.1202 Authority and role of NRC staff.
- 10 CFR 2.339 Expedited decisionmaking procedure.
- 10 CFR 2.340 Initial decision in certain contested proceedings; immediate effectiveness of initial decisions; issuance of authorizations, permits, and licenses.
- 10 CFR 2.600 Scope of subpart.
- 10 CFR 2.627 Partial decision on site suitability issues in combined license proceeding.
- 10 CFR 2.643 Acceptance and docketing of application for limited work authorization.
- 10 CFR 2.649 Partial decisions on limited work authorization.
- 10 CFR 26.3 Scope.
- 10 CFR 50.12 Specific exemptions.
- 10 CFR 51.101 Limitations on actions.
- 10 CFR 51.103 Record of decision—general.
- 10 CFR 51.105 Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations.
- 10 CFR 51.107 Public hearings in proceedings for issuance of combined licenses; limited work authorizations.
- 10 CFR 51.49 Environmental report—limited work authorization.
- 10 CFR 52.1 Definitions.
- 10 CFR 52.17 Contents of applications; technical information.
- 10 CFR 52.24 Issuance of early site permit.
- 10 CFR 52.27 Limited work authorization after issuance of early site permit.
- 10 CFR 52.80 Contents of applications; additional technical information.
- 10 CFR 52.91 Authorization to conduct limited work authorization activities.
- 10 CFR 52.99 Inspection during construction; ITAAC schedules and notifications; NRC notices.
- 10 CFR Appendix A to Part 100 Seismic and Geologic Siting Criteria for Nuclear Power Plants
- 10 CFR Appendix N to Part 50 Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites
- 10 CFR Appendix Q to Part 50 Pre-Application Early Review of Site Suitability Issues
- 10 CFR Appendix S to Part 50 Earthquake Engineering Criteria for Nuclear Power Plants