Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
10 CFR 50.72 Immediate notification requirements for operating nuclear power reactors.
10 CFR 50.72 Immediate notification requirements for operating nuclear power reactors., “Immediate notification requirements for operating nuclear power reactors”, is a CFR section of 10 CFR Part 50, Subject Group: Inspections, Records, Reports, Notifications—Inspections, Records, Reports, Notifications; in force.
https://ontology.bommaritollc.com/id/01a0f08b-90a6-730d-8381-67a1f7550f1f
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 10 CFR 50.72 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Immediate notification requirements for operating nuclear power reactorsen |
| schema:url | |
| skos:prefLabel | 10 CFR 50.72 Immediate notification requirements for operating nuclear power reactors.en |
Related
Cited by (14)eli:cites
- 10 CFR 20.2201 Reports of theft or loss of licensed material.
- 10 CFR 20.2202 Notification of incidents.
- 10 CFR 21.2 Scope.
- 10 CFR 30.50 Reporting requirements.
- 10 CFR 40.60 Reporting requirements.
- 10 CFR 50.36 Technical specifications.
- 10 CFR 50.46 Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
- 10 CFR 50.54 Conditions of licenses.
- 10 CFR 50.69 Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
- 10 CFR 50.8 Information collection requirements: OMB approval.
- 10 CFR 70.50 Reporting requirements.
- 10 CFR 73.1200 Notification of physical security events.
- 10 CFR 73.77 Cyber security event notifications.
- 10 CFR Appendix J to Part 50 Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors