# 10 CFR 52.39 Finality of early site permit determinations.

10 CFR 52.39 Finality of early site permit determinations., “Finality of early site permit determinations”, is a CFR section of [10 CFR Part 52, Subpart A—Early Site Permits](https://ontology.bommaritollc.com/id/01a0f08b-8863-717b-a190-5905685a2a6b); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421>

Within: [Title 10—Energy](https://ontology.bommaritollc.com/id/01a0f08b-878a-71f3-99fd-1c8c014334b4) › [10 CFR Chapter I—NUCLEAR REGULATORY COMMISSION](https://ontology.bommaritollc.com/id/01a0f08b-87a7-7005-a100-d6f226cd50d7) › [10 CFR Part 52—Licenses, certifications, and approvals for nuclear power plants](https://ontology.bommaritollc.com/id/01a0f08b-8ab7-712a-a368-9adaeccf1bfd) › [10 CFR Part 52, Subpart A—Early Site Permits](https://ontology.bommaritollc.com/id/01a0f08b-8863-717b-a190-5905685a2a6b)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 10 CFR 52.39](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29e1c4c8dc88)
- `eli:cites`:
  - [10 CFR 2.206 Requests for action under this subpart.](https://ontology.bommaritollc.com/id/01a0f08b-8bf8-71ea-875f-b25a55aed6ee)
  - [10 CFR 50.54 Conditions of licenses.](https://ontology.bommaritollc.com/id/01a0f08b-9095-7208-a235-c4162aa5002a)
  - [10 CFR 50.90 Application for amendment of license, construction permit, or early site permit.](https://ontology.bommaritollc.com/id/01a0f08b-90ad-76f7-9c4b-44a9705a1420)
  - [10 CFR 50.109 Backfitting.](https://ontology.bommaritollc.com/id/01a0f08b-90b3-76a4-a379-4d7d581ee3df)
  - [10 CFR 52.17 Contents of applications; technical information.](https://ontology.bommaritollc.com/id/01a0f08b-9146-7754-861a-12cd783da0a6)
  - [10 CFR 52.26 Duration of permit.](https://ontology.bommaritollc.com/id/01a0f08b-914a-7119-b873-02312ddbc899)
  - [10 CFR 52.33 Duration of renewal.](https://ontology.bommaritollc.com/id/01a0f08b-914e-7468-aea9-ccd4f3b84c7d)
  - [10 CFR 52.103 Operation under a combined license.](https://ontology.bommaritollc.com/id/01a0f08b-9166-779e-b1e2-5c44a74464f4)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title10-vol1](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d402bf19b2)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f08b-a6e8-72a5-9276-ecbfffe9b9ed)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d0-5aad-7240-9842-6bdaa850de24)
  - [evidence from https://www.govinfo.gov/link/cfr/10/52?sectionnum=39&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-1d66-779d-9466-32b8fae00ee7)
- `schema:isPartOf`: [10 CFR Part 52, Subpart A—Early Site Permits](https://ontology.bommaritollc.com/id/01a0f08b-8863-717b-a190-5905685a2a6b)
- `schema:legislationIdentifier`: 10 CFR 52.39
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Finality of early site permit determinations
- `schema:url`: [https://www.govinfo.gov/link/cfr/10/52?sectionnum=39&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/10/52?sectionnum=39&year=mostrecent&link-type=details)
- `skos:prefLabel`: 10 CFR 52.39 Finality of early site permit determinations.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/10/52?sectionnum=39&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title10-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (7; `eli:cites`):
  - [10 CFR 2.202 Orders.](https://ontology.bommaritollc.com/id/01a0f08b-8bf5-7732-b956-9354df68cf85)
  - [10 CFR 50.109 Backfitting.](https://ontology.bommaritollc.com/id/01a0f08b-90b3-76a4-a379-4d7d581ee3df)
  - [10 CFR 51.107 Public hearings in proceedings for issuance of combined licenses; limited work authorizations.](https://ontology.bommaritollc.com/id/01a0f08b-912e-76e5-b910-ac12856e8350)
  - [10 CFR 52.11 Information collection requirements: OMB approval.](https://ontology.bommaritollc.com/id/01a0f08b-9142-76ac-b90c-d7bf60909bc8)
  - [10 CFR 52.35 Use of site for other purposes.](https://ontology.bommaritollc.com/id/01a0f08b-914f-70e9-87b9-320f175860fa)
  - [10 CFR 52.79 Contents of applications; technical information in final safety analysis report.](https://ontology.bommaritollc.com/id/01a0f08b-915d-72f3-a840-7246abcb6269)
  - [10 CFR 52.83 Finality of referenced NRC approvals; partial initial decision on site suitability.](https://ontology.bommaritollc.com/id/01a0f08b-9160-7186-be61-1c4037568e7c)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421)
Cite as: 10 CFR 52.39 Finality of early site permit determinations.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f08b-9150-7357-abbe-29d57cffa421
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
