Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
14 CFR Part 25, Subpart D, Subject Group: Control Systems—Control Systems
14 CFR Part 25, Subpart D, Subject Group: Control Systems—Control Systems, “Control Systems”, is a CFR division of 14 CFR Part 25, Subpart D—Design and Construction.
https://ontology.bommaritollc.com/id/01a0f08f-2eb7-7454-a493-3d7ea9009155
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 14 CFR Part 25, Subpart D, Subject Group: Control Systems |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Control Systemsen |
| skos:prefLabel | 14 CFR Part 25, Subpart D, Subject Group: Control Systems—Control Systemsen |
Related
Parts (14)schema:isPartOf
- 14 CFR 25.671 General.
- 14 CFR 25.672 Stability augmentation and automatic and power-operated systems.
- 14 CFR 25.675 Stops.
- 14 CFR 25.677 Trim systems.
- 14 CFR 25.679 Control system gust locks.
- 14 CFR 25.681 Limit load static tests.
- 14 CFR 25.683 Operation tests.
- 14 CFR 25.685 Control system details.
- 14 CFR 25.689 Cable systems.
- 14 CFR 25.693 Joints.
- 14 CFR 25.697 Lift and drag devices, controls.
- 14 CFR 25.699 Lift and drag device indicator.
- 14 CFR 25.701 Flap and slat interconnection.
- 14 CFR 25.703 Takeoff warning system.