# 18 CFR Part 292, Subpart B—Qualifying Cogeneration and Small Power Production Facilities

18 CFR Part 292, Subpart B—Qualifying Cogeneration and Small Power Production Facilities, “Qualifying Cogeneration and Small Power Production Facilities”, is a CFR division of [18 CFR Part 292—Regulations under sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 with regard to small power production and cogeneration](https://ontology.bommaritollc.com/id/01a0f092-04f8-7767-a41c-79676a57a5d8).

IRI: <https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b>

Within: [Title 18—Conservation of Power and Water Resources](https://ontology.bommaritollc.com/id/01a0f092-03b9-71b5-ad32-f60660301408) › [18 CFR Chapter I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY](https://ontology.bommaritollc.com/id/01a0f092-03cf-75f8-adbe-bcc305e6ed30) › [18 CFR Chapter I, Subchapter K—REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978](https://ontology.bommaritollc.com/id/01a0f092-0428-75d4-ac92-dbab4ea05a1c) › [18 CFR Part 292—Regulations under sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 with regard to small power production and cogeneration](https://ontology.bommaritollc.com/id/01a0f092-04f8-7767-a41c-79676a57a5d8)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-division 18 CFR Part 292, Subpart B](https://ontology.bommaritollc.com/id/01a0f092-042b-7053-8c5f-100fa196bbbb)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title18-vol1](https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b785039c6ea1)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f092-0d51-76ac-8354-6e3e84a3ee3b)
- `schema:isPartOf`: [18 CFR Part 292—Regulations under sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 with regard to small power production and cogeneration](https://ontology.bommaritollc.com/id/01a0f092-04f8-7767-a41c-79676a57a5d8)
- `schema:legislationIdentifier`: 18 CFR Part 292, Subpart B
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationType`: [CFR division](https://ontology.bommaritollc.com/vocab/leg/cfrDivision)
- `schema:name`: Qualifying Cogeneration and Small Power Production Facilities
- `skos:prefLabel`: 18 CFR Part 292, Subpart B—Qualifying Cogeneration and Small Power Production Facilities

## Elsewhere

- [Source](https://www.govinfo.gov/app/details/CFR-2025-title18-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (10; `schema:isPartOf`):
  - [18 CFR 292.201 Scope.](https://ontology.bommaritollc.com/id/01a0f092-0849-723d-a4d7-9da49c676b0d)
  - [18 CFR 292.202 Definitions.](https://ontology.bommaritollc.com/id/01a0f092-0849-723d-a4d7-9db1588fcd12)
  - [18 CFR 292.203 General requirements for qualification.](https://ontology.bommaritollc.com/id/01a0f092-084a-733a-bfff-ebe7ff2b4164)
  - [18 CFR 292.204 Criteria for qualifying small power production facilities.](https://ontology.bommaritollc.com/id/01a0f092-084b-7160-8e0f-f14904586983)
  - [18 CFR 292.205 Criteria for qualifying cogeneration facilities.](https://ontology.bommaritollc.com/id/01a0f092-084c-7007-90b0-a90924255a35)
  - [18 CFR 292.207 Procedures for obtaining qualifying status.](https://ontology.bommaritollc.com/id/01a0f092-084c-7007-90b0-a9177c2c0e33)
  - [18 CFR 292.208 Special requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://ontology.bommaritollc.com/id/01a0f092-084d-761a-b634-dcdc85cdb719)
  - [18 CFR 292.209 Exceptions from requirements for hydroelectric small power production facilities located at a new dam or diversion.](https://ontology.bommaritollc.com/id/01a0f092-084e-7447-a707-c902fabf434b)
  - [18 CFR 292.210 Petition alleging commitment of substantial monetary resources before October 16, 1986.](https://ontology.bommaritollc.com/id/01a0f092-084f-70bd-9c3e-e529707936a4)
  - [18 CFR 292.211 Petition for initial determination on whether a project has a substantial adverse effect on the environment (AEE petition).](https://ontology.bommaritollc.com/id/01a0f092-0850-73c1-9463-b8eabe2be807)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b)
Cite as: 18 CFR Part 292, Subpart B—Qualifying Cogeneration and Small Power Production Facilities. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f092-042a-758d-b0aa-b78659591f5b
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
