# 18 CFR Part 7—Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects

18 CFR Part 7—Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects, “Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for…”, is a CFR part of [18 CFR Chapter I, Subchapter B—REGULATIONS UNDER THE FEDERAL POWER ACT](https://ontology.bommaritollc.com/id/01a0f092-03e5-77b1-a123-5d04314b0e92); it is made under 2 laws; in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5>

Within: [Title 18—Conservation of Power and Water Resources](https://ontology.bommaritollc.com/id/01a0f092-03b9-71b5-ad32-f60660301408) › [18 CFR Chapter I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY](https://ontology.bommaritollc.com/id/01a0f092-03cf-75f8-adbe-bcc305e6ed30) › [18 CFR Chapter I, Subchapter B—REGULATIONS UNDER THE FEDERAL POWER ACT](https://ontology.bommaritollc.com/id/01a0f092-03e5-77b1-a123-5d04314b0e92)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-part 18 CFR Part 7](https://ontology.bommaritollc.com/id/01a0f092-04cc-77d2-8003-cbfe242f8cdd)
- **authority note** (`bcleg:authorityNote`): 16 U.S.C. 791a-825r; Pub. L. 115-270, 132 Stat. 3765.
- `eli:based_on`:
  - [Pub. L. 115-270](https://ontology.bommaritollc.com/id/01a0edf4-a81e-7400-a192-c5f65f537409)
  - [Chapter 12—Federal Regulation and Development of Power](https://ontology.bommaritollc.com/id/01a0f068-edce-76d5-9d4f-95eeccb1ffd4)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title18-vol1](https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f0fccfbfa9a)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f092-0d9f-74f6-b60f-c3b8ef4236d1)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0cf-76af-7386-8ab4-44fc57b0aac9)
  - [evidence from https://www.govinfo.gov/link/cfr/18/7?year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f16-3e37-7045-b309-e9c3e3d7764e)
- `schema:isPartOf`: [18 CFR Chapter I, Subchapter B—REGULATIONS UNDER THE FEDERAL POWER ACT](https://ontology.bommaritollc.com/id/01a0f092-03e5-77b1-a123-5d04314b0e92)
- `schema:legislationIdentifier`: 18 CFR Part 7
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR part](https://ontology.bommaritollc.com/vocab/leg/cfrPart)
- `schema:name`: Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects
- `schema:url`: [https://www.govinfo.gov/link/cfr/18/7?year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/18/7?year=mostrecent&link-type=details)
- `skos:prefLabel`: 18 CFR Part 7—Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects
- **source note** (`bcleg:sourceNote`): Order 858, 84 FR 17078, Apr. 24, 2019, unless otherwise noted.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/18/7?year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title18-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (9; `schema:isPartOf`):
  - [18 CFR 7.1 Applicability and definitions.](https://ontology.bommaritollc.com/id/01a0f092-061d-70df-9035-f90f53697739)
  - [18 CFR 7.2 Use of expedited licensing process.](https://ontology.bommaritollc.com/id/01a0f092-061e-7322-be9b-12853f6ed08b)
  - [18 CFR 7.3 Adequacy review of application.](https://ontology.bommaritollc.com/id/01a0f092-061f-72ec-b5cb-7ab8978dd0a7)
  - [18 CFR 7.4 Additional information.](https://ontology.bommaritollc.com/id/01a0f092-0620-7152-843e-9017c61e1059)
  - [18 CFR 7.5 Decision on request to use expedited licensing process.](https://ontology.bommaritollc.com/id/01a0f092-0620-7152-843e-9024f0b15d12)
  - [18 CFR 7.6 Notice of acceptance and ready for environmental analysis.](https://ontology.bommaritollc.com/id/01a0f092-0621-71e6-8b8d-183f6c20a971)
  - [18 CFR 7.7 Amendment of application.](https://ontology.bommaritollc.com/id/01a0f092-0622-741d-8265-9ced10cd3a10)
  - [18 CFR 7.8 Other provisions.](https://ontology.bommaritollc.com/id/01a0f092-0623-7495-b74e-e1c9c441aab5)
  - [18 CFR 7.9 Transition provision.](https://ontology.bommaritollc.com/id/01a0f092-0624-74f9-8280-e005ac54bb72)
- Cited by (1; `eli:cites`):
  - [FR Doc. 2024-11896: Establishment of Categorical Reasonable Period of Time for Action on Requests for Water Quality Certification Under Section 401(a)(1) of the Clean Water Act and Clarifying Types of Hydroelectric Project Proceedings That May Require Water Quality Certification](https://ontology.bommaritollc.com/id/01a110b3-6d06-7697-954b-542d9e3a8ff7)
- Its changes, from (1; `eli:changes`):
  - [FR Doc. 2024-27981: Establishing Reasonable Period of Time and Clarifications Regarding Clean Water Act Section 401(a)(1) Certifications for Hydroelectric Proceedings](https://ontology.bommaritollc.com/id/01a110b3-d5e1-7014-a948-8c1e3cc87416)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5)
Cite as: 18 CFR Part 7—Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f092-04cb-71b5-82cc-2f10e7f685a5
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
