Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
21 CFR Part 211, Subpart F—Production and Process Controls
21 CFR Part 211, Subpart F—Production and Process Controls, “Production and Process Controls”, is a CFR division of 21 CFR Part 211—Current good manufacturing practice for finished pharmaceuticals.
https://ontology.bommaritollc.com/id/01a0f094-b5bb-732f-a808-a9c93c65e288
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 21 CFR Part 211, Subpart F |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Production and Process Controlsen |
| skos:prefLabel | 21 CFR Part 211, Subpart F—Production and Process Controlsen |
Related
Parts (8)schema:isPartOf
- 21 CFR 211.100 Written procedures; deviations.
- 21 CFR 211.101 Charge-in of components.
- 21 CFR 211.103 Calculation of yield.
- 21 CFR 211.105 Equipment identification.
- 21 CFR 211.110 Sampling and testing of in-process materials and drug products.
- 21 CFR 211.111 Time limitations on production.
- 21 CFR 211.113 Control of microbiological contamination.
- 21 CFR 211.115 Reprocessing.