# 23 CFR 645.109 Preliminary engineering.

23 CFR 645.109 Preliminary engineering., “Preliminary engineering”, is a CFR section of [23 CFR Part 645, Subpart A—Utility Relocations, Adjustments, and Reimbursement](https://ontology.bommaritollc.com/id/01a0f096-b025-74fd-9b1e-a4d8854e5948); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db>

Within: [Title 23—Highways](https://ontology.bommaritollc.com/id/01a0f096-afe3-7007-aefd-8a1e8d07b153) › [23 CFR Chapter I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION](https://ontology.bommaritollc.com/id/01a0f096-aff6-76a0-b213-7de476ddc2db) › [23 CFR Chapter I, Subchapter G—ENGINEERING AND TRAFFIC OPERATIONS](https://ontology.bommaritollc.com/id/01a0f096-b012-76d6-b8d2-2f4293313ed0) › [23 CFR Part 645—Utilities](https://ontology.bommaritollc.com/id/01a0f096-b092-76a8-bf9b-2ddf75b4d70a) › [23 CFR Part 645, Subpart A—Utility Relocations, Adjustments, and Reimbursement](https://ontology.bommaritollc.com/id/01a0f096-b025-74fd-9b1e-a4d8854e5948)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 23 CFR 645.109](https://ontology.bommaritollc.com/id/01a0f096-b29d-7171-91ce-801b482501fa)
- `eli:cites`: [23 CFR Part 172—Procurement, management, and administration of engineering and design related services](https://ontology.bommaritollc.com/id/01a0f096-b074-72bb-992a-c8a9479e2312)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title23-vol1](https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e4ccd6f41e)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f096-b6b2-70c7-ac64-b3af3f648ffb)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d0-d4aa-7730-a005-d6498a5b78fc)
  - [evidence from https://www.govinfo.gov/link/cfr/23/645?sectionnum=109&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-7608-7472-9353-1f180ba212b1)
- `schema:isPartOf`: [23 CFR Part 645, Subpart A—Utility Relocations, Adjustments, and Reimbursement](https://ontology.bommaritollc.com/id/01a0f096-b025-74fd-9b1e-a4d8854e5948)
- `schema:legislationIdentifier`: 23 CFR 645.109
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Preliminary engineering
- `schema:url`: [https://www.govinfo.gov/link/cfr/23/645?sectionnum=109&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/23/645?sectionnum=109&year=mostrecent&link-type=details)
- `skos:prefLabel`: 23 CFR 645.109 Preliminary engineering.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/23/645?sectionnum=109&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title23-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db)
Cite as: 23 CFR 645.109 Preliminary engineering.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f096-b29c-762f-98f2-24e59929f0db
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
