# 25 CFR 175.400 Will the utility extend or upgrade its electric system to serve new or increased loads?

25 CFR 175.400 Will the utility extend or upgrade its electric system to serve new or increased loads?, “Will the utility extend or upgrade its electric system to serve new or increased loads?”, is a CFR section of [25 CFR Part 175, Subpart D—System Extensions and Upgrades, Rights-of-Way, and Paperwork Reduction Act](https://ontology.bommaritollc.com/id/01a0f098-8f31-751d-af0d-a56d1ead2391); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6>

Within: [Title 25—Indians](https://ontology.bommaritollc.com/id/01a0f098-8e0f-7433-b38b-c0c5b7c6c804) › [25 CFR Chapter I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f098-8e2f-71d5-8727-aaaba11f8052) › [25 CFR Chapter I, Subchapter H—LAND AND WATER](https://ontology.bommaritollc.com/id/01a0f098-8eb7-74f3-b83a-9fc76e0d5c7b) › [25 CFR Part 175—Electric power utilities](https://ontology.bommaritollc.com/id/01a0f098-908c-71ac-b865-9c343ab46b65) › [25 CFR Part 175, Subpart D—System Extensions and Upgrades, Rights-of-Way, and Paperwork Reduction Act](https://ontology.bommaritollc.com/id/01a0f098-8f31-751d-af0d-a56d1ead2391)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 25 CFR 175.400](https://ontology.bommaritollc.com/id/01a0f098-9b77-76c0-99ff-70108468d3e1)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title25-vol1](https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00ef72e65429)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f098-aa19-76c1-919b-557650e4713e)
  - [evidence from https://www.govinfo.gov/link/cfr/25/175?sectionnum=400&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-8353-76a4-a2fd-1eb8ff95574c)
- `schema:isPartOf`: [25 CFR Part 175, Subpart D—System Extensions and Upgrades, Rights-of-Way, and Paperwork Reduction Act](https://ontology.bommaritollc.com/id/01a0f098-8f31-751d-af0d-a56d1ead2391)
- `schema:legislationIdentifier`: 25 CFR 175.400
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Will the utility extend or upgrade its electric system to serve new or increased loads?
- `schema:url`: [https://www.govinfo.gov/link/cfr/25/175?sectionnum=400&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/25/175?sectionnum=400&year=mostrecent&link-type=details)
- `skos:prefLabel`: 25 CFR 175.400 Will the utility extend or upgrade its electric system to serve new or increased loads?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/25/175?sectionnum=400&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title25-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6)
Cite as: 25 CFR 175.400 Will the utility extend or upgrade its electric system to serve new or increased loads?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f098-9b76-73b3-a3ed-00f06fd17db6
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
