# 30 CFR 250.125 Service fees.

30 CFR 250.125 Service fees., “Service fees”, is a CFR section of [30 CFR Part 250, Subpart A, Subject Group: Fees—Fees](https://ontology.bommaritollc.com/id/01a0f09d-f90e-765b-8849-e7a6bba622fc); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7>

Within: [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82) › [30 CFR Chapter II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f09d-f8ef-76d7-a66f-225750a0ea21) › [30 CFR Chapter II, Subchapter B—OFFSHORE](https://ontology.bommaritollc.com/id/01a0f09d-f907-7262-acb5-f82efbb0a6f7) › [30 CFR Part 250—Oil and gas and sulphur operations in the Outer Continental Shelf](https://ontology.bommaritollc.com/id/01a0f09d-fc1b-768d-9b4a-10fe966ca3e2) › [30 CFR Part 250, Subpart A—General](https://ontology.bommaritollc.com/id/01a0f09d-f908-77c2-b3ac-0701da775d92) › [30 CFR Part 250, Subpart A, Subject Group: Fees—Fees](https://ontology.bommaritollc.com/id/01a0f09d-f90e-765b-8849-e7a6bba622fc)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 30 CFR 250.125](https://ontology.bommaritollc.com/id/01a0f09e-0cc6-7098-9434-9c2dd61c1568)
- `eli:cites`:
  - [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82)
  - [30 CFR 250.171 How do I request a suspension?](https://ontology.bommaritollc.com/id/01a0f09e-0cdc-70e0-b0a5-7d19a7130bae)
  - [30 CFR 250.198 Documents incorporated by reference.](https://ontology.bommaritollc.com/id/01a0f09e-0cf6-71c1-8267-52b1d35860b5)
  - [30 CFR 250.410 How do I obtain approval to drill a well?](https://ontology.bommaritollc.com/id/01a0f09e-0d39-767b-a2b9-21fc8f36b410)
  - [30 CFR 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?](https://ontology.bommaritollc.com/id/01a0f09e-0d69-74d8-b636-4df2e912b51b)
  - [30 CFR 250.513 Approval and reporting of well-completion operations.](https://ontology.bommaritollc.com/id/01a0f09e-0d81-765b-8c88-6c3dfd98e02d)
  - [30 CFR 250.613 Approval and reporting for well-workover operations.](https://ontology.bommaritollc.com/id/01a0f09e-0da2-766f-8190-4f124b92ac55)
  - [30 CFR 250.842 Approval of safety systems design and installation features.](https://ontology.bommaritollc.com/id/01a0f09e-0e10-7224-8afb-3679bb758536)
  - [30 CFR 250.905 How do I get approval for the installation, modification, or repair of my platform?](https://ontology.bommaritollc.com/id/01a0f09e-0e40-7718-a009-3e589db63d7d)
  - [30 CFR 250.1000 General requirements.](https://ontology.bommaritollc.com/id/01a0f09e-0e4e-7330-9a4c-54bc412f3925)
  - [30 CFR 250.1008 Reports.](https://ontology.bommaritollc.com/id/01a0f09e-0e91-72f5-ba4a-cbf8d795dd7e)
  - [30 CFR 250.1015 Applications for pipeline right-of-way grants.](https://ontology.bommaritollc.com/id/01a0f09e-0e99-7474-8a39-9c0f4bce4705)
  - [30 CFR 250.1018 Assignment of pipeline right-of-way grants.](https://ontology.bommaritollc.com/id/01a0f09e-0e9c-7287-94bd-1d27caece5a4)
  - [30 CFR 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?](https://ontology.bommaritollc.com/id/01a0f09e-0ea7-72fa-84d7-e93211778be5)
  - [30 CFR 250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?](https://ontology.bommaritollc.com/id/01a0f09e-0ea8-748d-bf48-7dcd870232f9)
  - [30 CFR 250.1158 How do I receive approval to downhole commingle hydrocarbons?](https://ontology.bommaritollc.com/id/01a0f09e-0eab-707f-a813-e20e7d44e6b7)
  - [30 CFR 250.1202 Liquid hydrocarbon measurement.](https://ontology.bommaritollc.com/id/01a0f09e-0eb9-72dd-a6a5-d623f80d4490)
  - [30 CFR 250.1203 Gas measurement.](https://ontology.bommaritollc.com/id/01a0f09e-0eb9-72dd-a6a5-d6315236dd62)
  - [30 CFR 250.1204 Surface commingling.](https://ontology.bommaritollc.com/id/01a0f09e-0eba-74cd-be5d-b35d5f874966)
  - [30 CFR 250.1303 How do I apply for voluntary unitization?](https://ontology.bommaritollc.com/id/01a0f09e-0ebf-703a-9e08-fcc74c08cbc3)
  - [30 CFR 250.1617 Application for permit to drill.](https://ontology.bommaritollc.com/id/01a0f09e-0f0f-73ca-848c-cfa9e0420e64)
  - [30 CFR 250.1618 Application for permit to modify.](https://ontology.bommaritollc.com/id/01a0f09e-0f11-76dc-aeb5-54c2b3d98ded)
  - [30 CFR 250.1704 What decommissioning applications and reports must I submit and when must I submit them?](https://ontology.bommaritollc.com/id/01a0f09e-0f27-722c-96d3-ef5ec6512ef3)
  - [30 CFR 250.1727 What information must I include in my final application to remove a platform or other facility?](https://ontology.bommaritollc.com/id/01a0f09e-0f3d-75fb-8447-598b29dee33a)
  - [30 CFR 250.1751 How do I decommission a pipeline in place?](https://ontology.bommaritollc.com/id/01a0f09e-0f4c-730e-920f-60f550435f12)
  - [30 CFR 250.1752 How do I remove a pipeline?](https://ontology.bommaritollc.com/id/01a0f09e-0f4d-7144-82b7-62fd388dd67c)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title30-vol1](https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b7f6048477c)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f09e-2d2a-7599-9f5b-1d3263df03df)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-114b-71f2-b75b-f3c8be5bc4ca)
  - [evidence from https://www.govinfo.gov/link/cfr/30/250?sectionnum=125&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-abfa-7574-ab4f-ddf000d68367)
- `schema:isPartOf`: [30 CFR Part 250, Subpart A, Subject Group: Fees—Fees](https://ontology.bommaritollc.com/id/01a0f09d-f90e-765b-8849-e7a6bba622fc)
- `schema:legislationIdentifier`: 30 CFR 250.125
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Service fees
- `schema:url`: [https://www.govinfo.gov/link/cfr/30/250?sectionnum=125&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/30/250?sectionnum=125&year=mostrecent&link-type=details)
- `skos:prefLabel`: 30 CFR 250.125 Service fees.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/30/250?sectionnum=125&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title30-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (31; `eli:cites`):
  - [30 CFR 250.1000 General requirements.](https://ontology.bommaritollc.com/id/01a0f09e-0e4e-7330-9a4c-54bc412f3925)
  - [30 CFR 250.1008 Reports.](https://ontology.bommaritollc.com/id/01a0f09e-0e91-72f5-ba4a-cbf8d795dd7e)
  - [30 CFR 250.1015 Applications for pipeline right-of-way grants.](https://ontology.bommaritollc.com/id/01a0f09e-0e99-7474-8a39-9c0f4bce4705)
  - [30 CFR 250.1018 Assignment of pipeline right-of-way grants.](https://ontology.bommaritollc.com/id/01a0f09e-0e9c-7287-94bd-1d27caece5a4)
  - [30 CFR 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?](https://ontology.bommaritollc.com/id/01a0f09e-0ea7-72fa-84d7-e93211778be5)
  - [30 CFR 250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?](https://ontology.bommaritollc.com/id/01a0f09e-0ea8-748d-bf48-7dcd870232f9)
  - [30 CFR 250.1158 How do I receive approval to downhole commingle hydrocarbons?](https://ontology.bommaritollc.com/id/01a0f09e-0eab-707f-a813-e20e7d44e6b7)
  - [30 CFR 250.1167 What information must I submit with forms and for approvals?](https://ontology.bommaritollc.com/id/01a0f09e-0eb6-737a-8585-dcb3e825fe70)
  - [30 CFR 250.1202 Liquid hydrocarbon measurement.](https://ontology.bommaritollc.com/id/01a0f09e-0eb9-72dd-a6a5-d623f80d4490)
  - [30 CFR 250.1203 Gas measurement.](https://ontology.bommaritollc.com/id/01a0f09e-0eb9-72dd-a6a5-d6315236dd62)
  - [30 CFR 250.1204 Surface commingling.](https://ontology.bommaritollc.com/id/01a0f09e-0eba-74cd-be5d-b35d5f874966)
  - [30 CFR 250.1303 How do I apply for voluntary unitization?](https://ontology.bommaritollc.com/id/01a0f09e-0ebf-703a-9e08-fcc74c08cbc3)
  - [30 CFR 250.1617 Application for permit to drill.](https://ontology.bommaritollc.com/id/01a0f09e-0f0f-73ca-848c-cfa9e0420e64)
  - [30 CFR 250.1618 Application for permit to modify.](https://ontology.bommaritollc.com/id/01a0f09e-0f11-76dc-aeb5-54c2b3d98ded)
  - [30 CFR 250.1704 What decommissioning applications and reports must I submit and when must I submit them?](https://ontology.bommaritollc.com/id/01a0f09e-0f27-722c-96d3-ef5ec6512ef3)
  - [30 CFR 250.171 How do I request a suspension?](https://ontology.bommaritollc.com/id/01a0f09e-0cdc-70e0-b0a5-7d19a7130bae)
  - [30 CFR 250.1727 What information must I include in my final application to remove a platform or other facility?](https://ontology.bommaritollc.com/id/01a0f09e-0f3d-75fb-8447-598b29dee33a)
  - [30 CFR 250.1751 How do I decommission a pipeline in place?](https://ontology.bommaritollc.com/id/01a0f09e-0f4c-730e-920f-60f550435f12)
  - [30 CFR 250.1752 How do I remove a pipeline?](https://ontology.bommaritollc.com/id/01a0f09e-0f4d-7144-82b7-62fd388dd67c)
  - [30 CFR 250.198 Documents incorporated by reference.](https://ontology.bommaritollc.com/id/01a0f09e-0cf6-71c1-8267-52b1d35860b5)
  - [30 CFR 250.227 What must the Project Conceptual Plan contain?](https://ontology.bommaritollc.com/id/01a0f09e-0d12-72f8-8f6e-916e77d88a1d)
  - [30 CFR 250.228 What must the New or Unusual Technology Conceptual Plan contain?](https://ontology.bommaritollc.com/id/01a0f09e-0d13-72c4-ba83-2ac6c63f8d75)
  - [30 CFR 250.229 What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?](https://ontology.bommaritollc.com/id/01a0f09e-0d15-756a-afc1-988f1451e438)
  - [30 CFR 250.237 What general information must my DWOP include?](https://ontology.bommaritollc.com/id/01a0f09e-0d1f-7094-bf68-fb9de1587c25)
  - [30 CFR 250.248 What information must I include in my Supplemental DWOP?](https://ontology.bommaritollc.com/id/01a0f09e-0d2c-7270-9e2b-9cc0ce4d0d0c)
  - [30 CFR 250.410 How do I obtain approval to drill a well?](https://ontology.bommaritollc.com/id/01a0f09e-0d39-767b-a2b9-21fc8f36b410)
  - [30 CFR 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?](https://ontology.bommaritollc.com/id/01a0f09e-0d69-74d8-b636-4df2e912b51b)
  - [30 CFR 250.513 Approval and reporting of well-completion operations.](https://ontology.bommaritollc.com/id/01a0f09e-0d81-765b-8c88-6c3dfd98e02d)
  - [30 CFR 250.613 Approval and reporting for well-workover operations.](https://ontology.bommaritollc.com/id/01a0f09e-0da2-766f-8190-4f124b92ac55)
  - [30 CFR 250.842 Approval of safety systems design and installation features.](https://ontology.bommaritollc.com/id/01a0f09e-0e10-7224-8afb-3679bb758536)
  - [30 CFR 250.905 How do I get approval for the installation, modification, or repair of my platform?](https://ontology.bommaritollc.com/id/01a0f09e-0e40-7718-a009-3e589db63d7d)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7)
Cite as: 30 CFR 250.125 Service fees.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
