# 30 CFR 285.704 After receiving the FDR, FIR, or project verification reports, what will BSEE do?

30 CFR 285.704 After receiving the FDR, FIR, or project verification reports, what will BSEE do?, “After receiving the FDR, FIR, or project verification reports, what will BSEE do?”, is a CFR section of [30 CFR Part 285, Subpart G, Subject Group: Reports—Reports](https://ontology.bommaritollc.com/id/01a0f09d-fa00-777c-b948-57e0b1aba2d0); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d>

Within: [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82) › [30 CFR Chapter II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f09d-f8ef-76d7-a66f-225750a0ea21) › [30 CFR Chapter II, Subchapter B—OFFSHORE](https://ontology.bommaritollc.com/id/01a0f09d-f907-7262-acb5-f82efbb0a6f7) › [30 CFR Part 285—Renewable energy and alternate uses of existing facilities on the Outer Continental Shelf](https://ontology.bommaritollc.com/id/01a0f09d-fc26-778d-9af6-9fbd62dc712a) › [30 CFR Part 285, Subpart G—Facility Design, Fabrication, and Installation](https://ontology.bommaritollc.com/id/01a0f09d-f9ff-76cf-89e3-39ee70fd9f72) › [30 CFR Part 285, Subpart G, Subject Group: Reports—Reports](https://ontology.bommaritollc.com/id/01a0f09d-fa00-777c-b948-57e0b1aba2d0)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 30 CFR 285.704](https://ontology.bommaritollc.com/id/01a0f09e-103d-73ef-9971-cbcd7e006734)
- `eli:cites`:
  - [30 CFR 285.700 What reports must I submit to BSEE before installing facilities described in my approved SAP, COP, or GAP?](https://ontology.bommaritollc.com/id/01a0f09e-1033-7533-a476-02c58092effa)
  - [30 CFR 285.701 What must I include in my Facility Design Report?](https://ontology.bommaritollc.com/id/01a0f09e-1035-74d9-aa3b-842f1db17864)
  - [30 CFR 285.702 What must I include in my Fabrication and Installation Report?](https://ontology.bommaritollc.com/id/01a0f09e-1038-75a4-91fa-decd42751fdd)
  - [30 CFR 285.712 What are the CVA's or project engineer's reporting requirements?](https://ontology.bommaritollc.com/id/01a0f09e-1047-75e2-94f3-708462cd5939)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title30-vol1](https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108c703e4bd1)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f09e-2e21-7159-a70a-0a0f14d8cd38)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-1228-72a4-8dc0-13cc8bd48145)
  - [evidence from https://www.govinfo.gov/link/cfr/30/285?sectionnum=704&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-ad6b-724f-9cb8-4a38a29852a5)
- `schema:isPartOf`: [30 CFR Part 285, Subpart G, Subject Group: Reports—Reports](https://ontology.bommaritollc.com/id/01a0f09d-fa00-777c-b948-57e0b1aba2d0)
- `schema:legislationIdentifier`: 30 CFR 285.704
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: After receiving the FDR, FIR, or project verification reports, what will BSEE do?
- `schema:url`: [https://www.govinfo.gov/link/cfr/30/285?sectionnum=704&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/30/285?sectionnum=704&year=mostrecent&link-type=details)
- `skos:prefLabel`: 30 CFR 285.704 After receiving the FDR, FIR, or project verification reports, what will BSEE do?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/30/285?sectionnum=704&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title30-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d)
Cite as: 30 CFR 285.704 After receiving the FDR, FIR, or project verification reports, what will BSEE do?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f09e-103c-72fc-bd3f-108dc6f0865d
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
