# 30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?

30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?, “What are the CVA's or project engineer's primary duties for fabrication and installation review?”, is a CFR section of [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593>

Within: [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82) › [30 CFR Chapter II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f09d-f8ef-76d7-a66f-225750a0ea21) › [30 CFR Chapter II, Subchapter B—OFFSHORE](https://ontology.bommaritollc.com/id/01a0f09d-f907-7262-acb5-f82efbb0a6f7) › [30 CFR Part 285—Renewable energy and alternate uses of existing facilities on the Outer Continental Shelf](https://ontology.bommaritollc.com/id/01a0f09d-fc26-778d-9af6-9fbd62dc712a) › [30 CFR Part 285, Subpart G—Facility Design, Fabrication, and Installation](https://ontology.bommaritollc.com/id/01a0f09d-f9ff-76cf-89e3-39ee70fd9f72) › [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 30 CFR 285.708](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38062612ee5)
- `eli:cites`:
  - [30 CFR 285.702 What must I include in my Fabrication and Installation Report?](https://ontology.bommaritollc.com/id/01a0f09e-1038-75a4-91fa-decd42751fdd)
  - [30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8)
  - [30 CFR 285.710 When conducting onsite installation inspections, what must the CVA or project engineer do?](https://ontology.bommaritollc.com/id/01a0f09e-1044-7371-b7c8-3c5cd7427d3d)
  - [30 CFR 285.714 What records relating to FDRs, FIRs, and Project Modification and Repair Reports must I keep?](https://ontology.bommaritollc.com/id/01a0f09e-1049-71c9-94bd-05f9241b1b4a)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title30-vol1](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e75b63fe2e)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f09e-2e23-75d0-a14e-f5577953e9bf)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-1229-7415-af9b-231613d7cf10)
  - [evidence from https://www.govinfo.gov/link/cfr/30/285?sectionnum=708&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-ad6c-72c7-8796-dbe3b2a08500)
- `schema:isPartOf`: [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8)
- `schema:legislationIdentifier`: 30 CFR 285.708
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What are the CVA's or project engineer's primary duties for fabrication and installation review?
- `schema:url`: [https://www.govinfo.gov/link/cfr/30/285?sectionnum=708&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/30/285?sectionnum=708&year=mostrecent&link-type=details)
- `skos:prefLabel`: 30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/30/285?sectionnum=708&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title30-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (4; `eli:cites`):
  - [30 CFR 285.637 When may I commence commercial operations on my commercial lease?](https://ontology.bommaritollc.com/id/01a0f09e-102b-774d-b279-cad4b40c0c46)
  - [30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8)
  - [30 CFR 285.710 When conducting onsite installation inspections, what must the CVA or project engineer do?](https://ontology.bommaritollc.com/id/01a0f09e-1044-7371-b7c8-3c5cd7427d3d)
  - [30 CFR 285.714 What records relating to FDRs, FIRs, and Project Modification and Repair Reports must I keep?](https://ontology.bommaritollc.com/id/01a0f09e-1049-71c9-94bd-05f9241b1b4a)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593)
Cite as: 30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
