# 30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?

30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?, “When conducting onsite fabrication inspections, what must the CVA or project engineer verify?”, is a CFR section of [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8>

Within: [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82) › [30 CFR Chapter II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f09d-f8ef-76d7-a66f-225750a0ea21) › [30 CFR Chapter II, Subchapter B—OFFSHORE](https://ontology.bommaritollc.com/id/01a0f09d-f907-7262-acb5-f82efbb0a6f7) › [30 CFR Part 285—Renewable energy and alternate uses of existing facilities on the Outer Continental Shelf](https://ontology.bommaritollc.com/id/01a0f09d-fc26-778d-9af6-9fbd62dc712a) › [30 CFR Part 285, Subpart G—Facility Design, Fabrication, and Installation](https://ontology.bommaritollc.com/id/01a0f09d-f9ff-76cf-89e3-39ee70fd9f72) › [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 30 CFR 285.709](https://ontology.bommaritollc.com/id/01a0f09e-1044-7371-b7c8-3c5a6e1dba8b)
- `eli:cites`: [30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title30-vol1](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d381c3743d1f)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f09e-2e24-745a-8711-5830fbd08ef6)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-122a-7455-99cb-e4fe64f7e9aa)
  - [evidence from https://www.govinfo.gov/link/cfr/30/285?sectionnum=709&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-ad6c-72c7-8796-dbe723bc2acb)
- `schema:isPartOf`: [30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent](https://ontology.bommaritollc.com/id/01a0f09d-fa02-7785-a001-25e3d9ae6ec8)
- `schema:legislationIdentifier`: 30 CFR 285.709
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
- `schema:url`: [https://www.govinfo.gov/link/cfr/30/285?sectionnum=709&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/30/285?sectionnum=709&year=mostrecent&link-type=details)
- `skos:prefLabel`: 30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/30/285?sectionnum=709&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title30-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (1; `eli:cites`):
  - [30 CFR 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?](https://ontology.bommaritollc.com/id/01a0f09e-1041-70cb-989b-b3e86fbf0593)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8)
Cite as: 30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
