# 30 CFR 816.49 Impoundments.

30 CFR 816.49 Impoundments., “Impoundments”, is a CFR section of [30 CFR Part 816—Permanent program performance standards—surface mining activities](https://ontology.bommaritollc.com/id/01a0f09d-fc84-70e5-b8ae-69ddbf4ce0e2); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806>

Within: [Title 30—Mineral Resources](https://ontology.bommaritollc.com/id/01a0f09d-f769-74db-bf2f-eadd678a0d82) › [30 CFR Chapter VII—OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f09d-fadf-7776-aa66-f239461a3a76) › [30 CFR Chapter VII, Subchapter K—PERMANENT PROGRAM PERFORMANCE STANDARDS](https://ontology.bommaritollc.com/id/01a0f09d-fae8-769f-ae96-54a720a05a45) › [30 CFR Part 816—Permanent program performance standards—surface mining activities](https://ontology.bommaritollc.com/id/01a0f09d-fc84-70e5-b8ae-69ddbf4ce0e2)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 30 CFR 816.49](https://ontology.bommaritollc.com/id/01a0f09e-1846-72a9-8418-f454f1a34717)
- `eli:cites`:
  - [5 U.S.C. 552 Public information; agency rules, opinions, orders, records, and proceedings](https://ontology.bommaritollc.com/id/01a0edf4-5b27-7466-a019-fef93b12cea0)
  - [1 CFR Part 51—Incorporation by reference](https://ontology.bommaritollc.com/id/01a0f085-3c9f-719c-b57c-b49468549a23)
  - [30 CFR 77.216 Water, sediment, or slurry impoundments and impounding structures; general.](https://ontology.bommaritollc.com/id/01a0f09e-0a94-75d2-ad84-0b5ec6fc3d52)
  - [30 CFR 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.](https://ontology.bommaritollc.com/id/01a0f09e-0a97-77bb-b51d-9a977b6e259e)
  - [30 CFR 780.25 Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.](https://ontology.bommaritollc.com/id/01a0f09e-17a9-7023-8998-71ddc1a1b564)
  - [30 CFR 816.84 Coal mine waste: Impounding structures.](https://ontology.bommaritollc.com/id/01a0f09e-1856-7536-9439-b105ef1b4d25)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title30-vol1](https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48867bf178ed)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f09e-2fd6-70f4-8e5d-2361b03b5cdd)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-1480-73b6-81c0-dbb2f272af22)
  - [evidence from https://www.govinfo.gov/link/cfr/30/816?sectionnum=49&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-afbb-7441-a624-37a81a48a88d)
- `schema:isPartOf`: [30 CFR Part 816—Permanent program performance standards—surface mining activities](https://ontology.bommaritollc.com/id/01a0f09d-fc84-70e5-b8ae-69ddbf4ce0e2)
- `schema:legislationIdentifier`: 30 CFR 816.49
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Impoundments
- `schema:url`: [https://www.govinfo.gov/link/cfr/30/816?sectionnum=49&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/30/816?sectionnum=49&year=mostrecent&link-type=details)
- `skos:prefLabel`: 30 CFR 816.49 Impoundments.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/30/816?sectionnum=49&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title30-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (6; `eli:cites`):
  - [30 CFR 701.5 Definitions.](https://ontology.bommaritollc.com/id/01a0f09e-1577-745a-8fbb-fe880694b380)
  - [30 CFR 780.25 Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.](https://ontology.bommaritollc.com/id/01a0f09e-17a9-7023-8998-71ddc1a1b564)
  - [30 CFR 816.102 Backfilling and grading: General requirements.](https://ontology.bommaritollc.com/id/01a0f09e-185c-771c-94bc-2c7121d425b2)
  - [30 CFR 816.46 Hydrologic balance: Siltation structures.](https://ontology.bommaritollc.com/id/01a0f09e-1844-717c-9584-1e8f15f60080)
  - [30 CFR 816.84 Coal mine waste: Impounding structures.](https://ontology.bommaritollc.com/id/01a0f09e-1856-7536-9439-b105ef1b4d25)
  - [30 CFR 827.12 Coal preparation plants: Performance standards.](https://ontology.bommaritollc.com/id/01a0f09e-18df-71ab-9be6-6e14c0db8556)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806)
Cite as: 30 CFR 816.49 Impoundments.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f09e-1845-7239-83a6-48878b7e1806
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
