33 CFR Part 117, Subpart A—General Requirements
33 CFR Part 117, Subpart A—General Requirements, “General Requirements”, is a CFR division of 33 CFR Part 117—Drawbridge operation regulations.
https://ontology.bommaritollc.com/id/01a0f0a2-bd33-7319-ab64-1e6b08063040
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR Part 117, Subpart A |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | General Requirementsen |
| skos:prefLabel | 33 CFR Part 117, Subpart A—General Requirementsen |
Related
Parts (23)schema:isPartOf
- 33 CFR 117.1 Purpose.
- 33 CFR 117.11 Unnecessary opening of the draw.
- 33 CFR 117.15 Signals.
- 33 CFR 117.17 Signalling for contiguous drawbridges.
- 33 CFR 117.19 Signalling when two or more vessels are approaching a drawbridge.
- 33 CFR 117.21 Signalling for an opened drawbridge.
- 33 CFR 117.23 Installation of radiotelephones.
- 33 CFR 117.24 Radiotelephone installation identification.
- 33 CFR 117.31 Drawbridge operations for emergency vehicles and emergency vessels.
- 33 CFR 117.33 Closure of draw for natural disasters or civil disorders.
- 33 CFR 117.35 Temporary change to a drawbridge operating schedule.
- 33 CFR 117.36 Closure of drawbridge for emergency repair.
- 33 CFR 117.39 Authorized closure of drawbridge due to infrequent requests for openings.
- 33 CFR 117.4 Definitions.
- 33 CFR 117.40 Advance notice for drawbridge opening.
- 33 CFR 117.41 Maintaining drawbridges in the fully open position.
- 33 CFR 117.42 Remotely operated and automated drawbridges.
- 33 CFR 117.47 Clearance gauges.
- 33 CFR 117.49 Process of violations.
- 33 CFR 117.5 When the drawbridge must open.
- 33 CFR 117.7 General requirements of drawbridge owners.
- 33 CFR 117.8 Permanent changes to drawbridge operation.
- 33 CFR 117.9 Delaying opening of a draw.