33 CFR Part 148, Subpart G—Environmental Review Criteria for Deepwater Ports
33 CFR Part 148, Subpart G—Environmental Review Criteria for Deepwater Ports, “Environmental Review Criteria for Deepwater Ports”, is a CFR division of 33 CFR Part 148—Deepwater ports: General.
https://ontology.bommaritollc.com/id/01a0f0a2-bdac-70ab-b08e-d7c33f5ff477
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR Part 148, Subpart G |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Environmental Review Criteria for Deepwater Portsen |
| skos:prefLabel | 33 CFR Part 148, Subpart G—Environmental Review Criteria for Deepwater Portsen |
Related
Parts (14)schema:isPartOf
- 33 CFR 148.700 How does the Deepwater Port Act interact with other Federal and State laws?
- 33 CFR 148.702 How were the environmental review criteria developed?
- 33 CFR 148.705 What is determined by the environmental evaluation?
- 33 CFR 148.707 What type of criteria will be used in an environmental review and how will they be applied?
- 33 CFR 148.708 Must the applicant's proposal reflect potential regulations?
- 33 CFR 148.709 How are these criteria reviewed and revised?
- 33 CFR 148.710 What environmental conditions must be satisfied?
- 33 CFR 148.715 How is an environmental review conducted?
- 33 CFR 148.720 What are the siting criteria?
- 33 CFR 148.722 Should the construction plan incorporate best available technology and recommended industry practices?
- 33 CFR 148.725 What are the design, construction and operational criteria?
- 33 CFR 148.730 What are the land use and coastal zone management criteria?
- 33 CFR 148.735 What are other critical criteria that must be evaluated?
- 33 CFR 148.737 What environmental statutes must an applicant follow?