# 33 CFR Part 157, Subpart B—Design, Equipment, and Installation

33 CFR Part 157, Subpart B—Design, Equipment, and Installation, “Design, Equipment, and Installation”, is a CFR division of [33 CFR Part 157—Rules for the protection of the marine environment relating to tank vessels carrying oil in bulk](https://ontology.bommaritollc.com/id/01a0f0a2-bfd7-7349-82c3-5f6dc3f96028).

IRI: <https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f>

Within: [Title 33—Navigation and Navigable Waters](https://ontology.bommaritollc.com/id/01a0f0a2-bc42-74ff-ba40-1797fee87526) › [33 CFR Chapter I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY](https://ontology.bommaritollc.com/id/01a0f0a2-bc63-7479-bfd9-eebb12b12dcd) › [33 CFR Chapter I, Subchapter O—POLLUTION](https://ontology.bommaritollc.com/id/01a0f0a2-bdfc-7523-857b-beb48227ee30) › [33 CFR Part 157—Rules for the protection of the marine environment relating to tank vessels carrying oil in bulk](https://ontology.bommaritollc.com/id/01a0f0a2-bfd7-7349-82c3-5f6dc3f96028)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-division 33 CFR Part 157, Subpart B](https://ontology.bommaritollc.com/id/01a0f0a2-be6d-7389-9d92-87789d6433f3)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title33-vol1](https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-43938d3c54e2)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0a2-dbe5-7618-9cf1-058d97c25ce4)
- `schema:isPartOf`: [33 CFR Part 157—Rules for the protection of the marine environment relating to tank vessels carrying oil in bulk](https://ontology.bommaritollc.com/id/01a0f0a2-bfd7-7349-82c3-5f6dc3f96028)
- `schema:legislationIdentifier`: 33 CFR Part 157, Subpart B
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationType`: [CFR division](https://ontology.bommaritollc.com/vocab/leg/cfrDivision)
- `schema:name`: Design, Equipment, and Installation
- `skos:prefLabel`: 33 CFR Part 157, Subpart B—Design, Equipment, and Installation

## Elsewhere

- [Source](https://www.govinfo.gov/app/details/CFR-2025-title33-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (27; `schema:isPartOf`):
  - [33 CFR 157.08 Applicability of subpart B.](https://ontology.bommaritollc.com/id/01a0f0a2-d0f6-71dd-855b-c50653999d6a)
  - [33 CFR 157.09 Segregated ballast.](https://ontology.bommaritollc.com/id/01a0f0a2-d0f7-7705-a1e2-55efcf82acf3)
  - [33 CFR 157.10 Segregated ballast tanks and crude oil washing systems for certain new vessels.](https://ontology.bommaritollc.com/id/01a0f0a2-d0f8-734d-9849-58a92d65e7b1)
  - [33 CFR 157.10a Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more.](https://ontology.bommaritollc.com/id/01a0f0a2-d0f9-7041-8c05-5d39c075ff99)
  - [33 CFR 157.10b Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fa-7661-8ff0-9679a2c6159a)
  - [33 CFR 157.10c Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fb-7012-8fd8-697daa8845ad)
  - [33 CFR 157.10d Double hulls on tank vessels.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fc-7546-940a-038a74415ef0)
  - [33 CFR 157.11 Pumping, piping and discharge arrangements.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fc-7546-940a-0398b700725a)
  - [33 CFR 157.12 Oil discharge monitoring and control system.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fd-779c-a5c3-de9d6fd0c569)
  - [33 CFR 157.12a Definitions.](https://ontology.bommaritollc.com/id/01a0f0a2-d0fe-705e-8364-490c336df984)
  - [33 CFR 157.12b Implementation requirements.](https://ontology.bommaritollc.com/id/01a0f0a2-d0ff-7459-a3c5-f8f302b811d5)
  - [33 CFR 157.12c Construction, maintenance, security, calibration, and training.](https://ontology.bommaritollc.com/id/01a0f0a2-d100-7315-a961-cff6f327d65c)
  - [33 CFR 157.12d Technical specifications.](https://ontology.bommaritollc.com/id/01a0f0a2-d101-72e4-8aaa-6229f9a6e8f7)
  - [33 CFR 157.12e Certificate of approval.](https://ontology.bommaritollc.com/id/01a0f0a2-d101-72e4-8aaa-6236ff127860)
  - [33 CFR 157.12f Workshop functional test requirements.](https://ontology.bommaritollc.com/id/01a0f0a2-d102-76bc-a64b-917ac794b55e)
  - [33 CFR 157.12g Plan approval requirements.](https://ontology.bommaritollc.com/id/01a0f0a2-d103-72ba-b9e7-9a1483e7f371)
  - [33 CFR 157.13 Designated observation area.](https://ontology.bommaritollc.com/id/01a0f0a2-d104-7504-b648-b07082c59a3e)
  - [33 CFR 157.14 Pump-room bottom protection.](https://ontology.bommaritollc.com/id/01a0f0a2-d10c-7289-a585-e65c0aef19c2)
  - [33 CFR 157.15 Slop tanks in tank vessels.](https://ontology.bommaritollc.com/id/01a0f0a2-d10d-727e-969c-e18944589b1e)
  - [33 CFR 157.17 Oil residue (sludge) tank.](https://ontology.bommaritollc.com/id/01a0f0a2-d10e-70cf-b6b7-7d9373f75235)
  - [33 CFR 157.19 Cargo tank arrangement and size.](https://ontology.bommaritollc.com/id/01a0f0a2-d10f-77f8-9efa-e5e2414dd907)
  - [33 CFR 157.20 Accidental oil outflow performance.](https://ontology.bommaritollc.com/id/01a0f0a2-d110-74a5-9f55-4fc4957d7c1f)
  - [33 CFR 157.21 Subdivision and stability.](https://ontology.bommaritollc.com/id/01a0f0a2-d111-7085-8790-1c49c4ceb610)
  - [33 CFR 157.22 Intact stability requirements.](https://ontology.bommaritollc.com/id/01a0f0a2-d113-73ad-b0eb-9cd0156d6597)
  - [33 CFR 157.23 Cargo and ballast system information.](https://ontology.bommaritollc.com/id/01a0f0a2-d114-7623-9cf5-caa138c5fec7)
  - [33 CFR 157.24 Submission of calculations, plans, and specifications.](https://ontology.bommaritollc.com/id/01a0f0a2-d115-717d-b9d9-6b0187967db5)
  - [33 CFR 157.24a Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks.](https://ontology.bommaritollc.com/id/01a0f0a2-d116-74b0-8d06-53c55c167641)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f)
Cite as: 33 CFR Part 157, Subpart B—Design, Equipment, and Installation. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
