Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
33 CFR Part 154—Facilities transferring oil or hazardous material in bulk
33 CFR Part 154—Facilities transferring oil or hazardous material in bulk, “Facilities transferring oil or hazardous material in bulk”, is a CFR part of 33 CFR Chapter I, Subchapter O—POLLUTION; it is made under 5 laws; in force.
https://ontology.bommaritollc.com/id/01a0f0a2-bfd2-7398-94f1-8ea5a66be158
Elsewhere
Facts
| adms:identifier | |
| authority note | 33 U.S.C. 1321(j)(1)(C), (j)(5), (j)(6), and (m)(2); 46 U.S.C. 70011, 70034; sec. 2, E.O. 12777, 56 FR 54757; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.2. Subpart F is also issued under 33 U.S.C. 2735. Vapor control recovery provisions of Subpart P are also issued under 42 U.S.C. 7511b(f)(2).en |
| eli:based_on | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR Part 154 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Facilities transferring oil or hazardous material in bulken |
| schema:url | |
| skos:prefLabel | 33 CFR Part 154—Facilities transferring oil or hazardous material in bulken |
Related
Cited by (32)eli:cites
- 33 CFR 105.105 Applicability.
- 33 CFR 149.103 What are the requirements for discharge containment and removal material and equipment?
- 33 CFR 154.100 Applicability.
- 33 CFR 154.1035 Specific requirements for facilities that could reasonably be expected to cause significant and substantial harm to the environment.
- 33 CFR 154.1060 Submission and approval procedures.
- 33 CFR 154.1110 Purpose and applicability.
- 33 CFR 154.1125 Additional response plan requirements.
- 33 CFR 154.1220 Response plan submission requirements.
- 33 CFR 154.1225 Specific response plan development and evaluation criteria and other requirements for fixed facilities that handle, store, or transport animal fats or vegetable oils.
- 33 CFR 154.1320 Response plan submission requirements.
- 33 CFR 154.1325 Response plan development and evaluation criteria for facilities that handle, store, or transport other non-petroleum oils.
- 33 CFR 154.2000 Applicability.
- 33 CFR 154.2001 Definitions.
- 33 CFR 154.545 Discharge containment equipment.
- 33 CFR 154.710 Persons in charge: Designation and qualification.
- 33 CFR 154.740 Records.
- 33 CFR 155.110 Definitions.
- 33 CFR 156.120 Requirements for transfer.
- 33 CFR 165.707 Safety Zone; Hurricanes, Tropical Storms and Other Disasters in Florida Keys.
- 33 CFR 165.791 Safety Zones; Heavy Weather and Natural or Other Disasters in San Juan Captain of the Port Zone.
- 33 CFR Appendix C to Part 154 Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans
- 40 CFR 300.185 Nongovernmental participation.
- 40 CFR 300.211 OPA facility and vessel response plans.
- 40 CFR Appendix E to Part 112 Determination and Evaluation of Required Response Resources for Facility Response Plans
- 46 CFR 39.1003 Definitions—TB/ALL.
- 46 CFR 39.1009 Additional tank vessel vapor processing unit requirements—TB/ALL.
- 46 CFR 39.3001 Operational requirements for vapor control systems during cargo transfer—TB/ALL.
- 46 CFR 39.6007 Operational requirements for tank barge cleaning—B/ALL.
- 49 CFR 130.130 Response and mitigation activities.
- 49 CFR 130.2 Scope.
2 more
Parts (15)schema:isPartOf
- 33 CFR Appendix A to Part 154 Guidelines for Detonation Flame Arresters
- 33 CFR Appendix C to Part 154 Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans
- 33 CFR Appendix D to Part 154 Training Elements for Oil Spill Response Plans
- 33 CFR Part 154, Appendix #1
- 33 CFR Part 154, Subpart A—General
- 33 CFR Part 154, Subpart B—Operations Manual
- 33 CFR Part 154, Subpart C—Equipment Requirements
- 33 CFR Part 154, Subpart D—Facility Operations
- 33 CFR Part 154, Subpart E
- 33 CFR Part 154, Subpart F—Response Plans for Oil Facilities
- 33 CFR Part 154, Subpart G—Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility Operating in Prince William Sound, Alaska
- 33 CFR Part 154, Subpart H—Response Plans for Animal Fats and Vegetable Oils Facilities
- 33 CFR Part 154, Subpart I—Response Plans for Other Non-Petroleum Oil Facilities
- 33 CFR Part 154, Subpart P—Marine Vapor Control Systems
- 33 CFR Part 154, Subparts J-O