# 34 CFR 75.112 Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework.

34 CFR 75.112 Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework., “Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework”, is a CFR section of [34 CFR Part 75, Subpart C—How To Apply for a Grant](https://ontology.bommaritollc.com/id/01a0f0a4-6937-7673-9a6b-bd347fec0a39); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448>

Within: [Title 34—Education](https://ontology.bommaritollc.com/id/01a0f0a4-68e5-73bf-8157-47bbae830616) › [34 CFR Subtitle A—Office of the Secretary, Department of Education](https://ontology.bommaritollc.com/id/01a0f0a4-6907-74c5-b991-e5e0d7259cee) › [34 CFR Part 75—Direct grant programs](https://ontology.bommaritollc.com/id/01a0f0a4-6be7-71f2-852f-9f52e3d5ea24) › [34 CFR Part 75, Subpart C—How To Apply for a Grant](https://ontology.bommaritollc.com/id/01a0f0a4-6937-7673-9a6b-bd347fec0a39)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 34 CFR 75.112](https://ontology.bommaritollc.com/id/01a0f0a4-6e05-7024-9008-954be3416f22)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title34-vol1](https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7ed9dbf70864)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0a4-81c8-7654-8d1d-c020bba357c3)
  - [evidence from https://www.govinfo.gov/link/cfr/34/75?sectionnum=112&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-c8c4-75e4-bb3d-6407ab4b389a)
- `schema:isPartOf`: [34 CFR Part 75, Subpart C—How To Apply for a Grant](https://ontology.bommaritollc.com/id/01a0f0a4-6937-7673-9a6b-bd347fec0a39)
- `schema:legislationIdentifier`: 34 CFR 75.112
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework
- `schema:url`: [https://www.govinfo.gov/link/cfr/34/75?sectionnum=112&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/34/75?sectionnum=112&year=mostrecent&link-type=details)
- `skos:prefLabel`: 34 CFR 75.112 Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/34/75?sectionnum=112&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title34-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448)
Cite as: 34 CFR 75.112 Include a proposed project period, timeline, project narrative, and a logic model or other conceptual framework.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0a4-6e04-701a-9b7e-7eda44f48448
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
