# 40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring—Continuous Emission Monitoring

40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring—Continuous Emission Monitoring, “Continuous Emission Monitoring”, is a CFR division of [40 CFR Part 62, Subpart JJJ—Federal Plan Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999](https://ontology.bommaritollc.com/id/01a0f0af-b573-7693-b6a9-16abebcdc3fe).

IRI: <https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 62—Approval and promulgation of State plans for designated facilities and pollutants](https://ontology.bommaritollc.com/id/01a0f0af-c786-7592-b51a-16e71a3222c2) › [40 CFR Part 62, Subpart JJJ—Federal Plan Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999](https://ontology.bommaritollc.com/id/01a0f0af-b573-7693-b6a9-16abebcdc3fe)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-division 40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring](https://ontology.bommaritollc.com/id/01a0f0af-b584-75fe-aca9-7f204738365f)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be76ff6a09b3)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-7740-722e-9c69-a5ce3bb34598)
- `schema:isPartOf`: [40 CFR Part 62, Subpart JJJ—Federal Plan Requirements for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999](https://ontology.bommaritollc.com/id/01a0f0af-b573-7693-b6a9-16abebcdc3fe)
- `schema:legislationIdentifier`: 40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationType`: [CFR division](https://ontology.bommaritollc.com/vocab/leg/cfrDivision)
- `schema:name`: Continuous Emission Monitoring
- `skos:prefLabel`: 40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring—Continuous Emission Monitoring

## Elsewhere

- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (12; `schema:isPartOf`):
  - [40 CFR 62.15170 What types of continuous emission monitoring must I perform?](https://ontology.bommaritollc.com/id/01a0f0af-f7b4-719c-b349-01ae32469b28)
  - [40 CFR 62.15175 What continuous emission monitoring systems must I install for gaseous pollutants?](https://ontology.bommaritollc.com/id/01a0f0af-f7b5-734d-b2ef-5864fb6072f4)
  - [40 CFR 62.15180 How are the data from the continuous emission monitoring systems used?](https://ontology.bommaritollc.com/id/01a0f0af-f7b7-76c5-9783-cb1063324891)
  - [40 CFR 62.15185 How do I make sure my continuous emission monitoring systems are operating correctly?](https://ontology.bommaritollc.com/id/01a0f0af-f7b8-75c4-bd43-7963114c7cc1)
  - [40 CFR 62.15190 Am I exempt from any 40 CFR part 60 appendix B or appendix F requirements to evaluate continuous emission monitoring systems?](https://ontology.bommaritollc.com/id/01a0f0af-f7bd-73b7-a804-369edee53ab0)
  - [40 CFR 62.15195 What is my schedule for evaluating continuous emission monitoring systems?](https://ontology.bommaritollc.com/id/01a0f0af-f7bf-77c7-b1f8-699a2222e499)
  - [40 CFR 62.15200 What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?](https://ontology.bommaritollc.com/id/01a0f0af-f7c0-7157-957c-98a706466d74)
  - [40 CFR 62.15205 What minimum amount of monitoring data must I collect with my continuous emission monitoring systems and is this requirement enforceable?](https://ontology.bommaritollc.com/id/01a0f0af-f7c1-7467-a7fe-75b38e31d815)
  - [40 CFR 62.15210 How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?](https://ontology.bommaritollc.com/id/01a0f0af-f7c3-74fb-8d7d-db44778d9d1f)
  - [40 CFR 62.15215 What is required for my continuous opacity monitoring system and how are the data used?](https://ontology.bommaritollc.com/id/01a0f0af-f7c5-77b8-aa30-e78dfb7f461b)
  - [40 CFR 62.15220 What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?](https://ontology.bommaritollc.com/id/01a0f0af-f7c6-7548-bc7a-17c74520df23)
  - [40 CFR 62.15225 What must I do if my continuous emission monitoring system is temporarily unavailable to meet the data collection requirements?](https://ontology.bommaritollc.com/id/01a0f0af-f7c8-74d1-ab9b-47445eda330c)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13)
Cite as: 40 CFR Part 62, Subpart JJJ, Subject Group: Continuous Emission Monitoring—Continuous Emission Monitoring. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0af-b582-774d-89fc-be77312e8b13
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
