Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act
40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act, “Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act”, is a CFR division of 40 CFR Part 125—Criteria and standards for the national pollutant discharge elimination system.
https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR Part 125, Subpart I |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Acten |
| skos:prefLabel | 40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Acten |
Related
Parts (10)schema:isPartOf
- 40 CFR 125.80 What are the purpose and scope of this subpart?
- 40 CFR 125.81 Who is subject to this subpart?
- 40 CFR 125.82 When must I comply with this subpart?
- 40 CFR 125.83 What special definitions apply to this subpart?
- 40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?
- 40 CFR 125.85 May alternative requirements be authorized?
- 40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?
- 40 CFR 125.87 As an owner or operator of a new facility, must I perform monitoring?
- 40 CFR 125.88 As an owner or operator of a new facility, must I keep records and report?
- 40 CFR 125.89 As the Director, what must I do to comply with the requirements of this subpart?