Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 60.254 Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles.
40 CFR 60.254 Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles., “Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open…”, is a CFR section of 40 CFR Part 60, Subpart Y—Standards of Performance for Coal Preparation and Processing Plants; in force.
https://ontology.bommaritollc.com/id/01a0f0af-e74d-718b-bbf1-5b86411d5e44
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 60.254 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage pilesen |
| schema:url | |
| skos:prefLabel | 40 CFR 60.254 Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles.en |