# 40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?

40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?, “How and when do I demonstrate continuous compliance with the emission limits and standards?”, is a CFR section of [40 CFR Part 60, Subpart LLLL, Subject Group: Continuous Compliance Requirements—Continuous Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b012-722e-a475-451a935ab6fe); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 60—Part 60—Standards of performance for new stationary sources (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c782-777c-981a-1bcdc4e34a0f) › [40 CFR Part 60, Subpart LLLL—Standards of Performance for New Sewage Sludge Incineration Units](https://ontology.bommaritollc.com/id/01a0f0af-b007-7323-8edf-a1b5286c7442) › [40 CFR Part 60, Subpart LLLL, Subject Group: Continuous Compliance Requirements—Continuous Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b012-722e-a475-451a935ab6fe)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 60.4885](https://ontology.bommaritollc.com/id/01a0f0af-edfa-7139-873a-7815122d0bd9)
- `eli:cites`:
  - [40 CFR Part 60—Part 60—Standards of performance for new stationary sources (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c782-777c-981a-1bcdc4e34a0f)
  - [40 CFR 60.13 Monitoring requirements.](https://ontology.bommaritollc.com/id/01a0f0af-e52a-70d6-acdb-018482e2192d)
  - [40 CFR 60.58b Compliance and performance testing.](https://ontology.bommaritollc.com/id/01a0f0af-e60f-72cf-a324-18d723aca399)
  - [40 CFR 60.4880 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?](https://ontology.bommaritollc.com/id/01a0f0af-edf5-75b0-85c6-0dbe7f386ea6)
  - [40 CFR 60.4900 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?](https://ontology.bommaritollc.com/id/01a0f0af-edfe-732f-8368-179466a1782c)
  - [40 CFR 60.4915 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0af-ee03-77ee-a5a9-cc8f67bc9574)
  - [40 CFR 60.4930 What definitions must I know?](https://ontology.bommaritollc.com/id/01a0f0af-ee09-77a0-85fe-816d92f15fdb)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b137389b9ab)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-9e04-720b-a75e-5d6b5a87cddb)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-53d4-736e-be0a-1581986deacf)
  - [evidence from https://www.govinfo.gov/link/cfr/40/60?sectionnum=4885&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-df2e-7490-94a9-700cc3253d9f)
- `schema:isPartOf`: [40 CFR Part 60, Subpart LLLL, Subject Group: Continuous Compliance Requirements—Continuous Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b012-722e-a475-451a935ab6fe)
- `schema:legislationIdentifier`: 40 CFR 60.4885
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: How and when do I demonstrate continuous compliance with the emission limits and standards?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/60?sectionnum=4885&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/60?sectionnum=4885&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/60?sectionnum=4885&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (10; `eli:cites`):
  - [40 CFR 60.4870 How do I establish my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-edf3-76d8-a3bc-5f7f1f31f39e)
  - [40 CFR 60.4890 How do I demonstrate continuous compliance with my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-edfa-7139-873a-78172aac53e9)
  - [40 CFR 60.4905 What are the monitoring and calibration requirements for compliance with my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-edff-73f9-889c-c5dcc1a3e869)
  - [40 CFR 60.4910 What records must I keep?](https://ontology.bommaritollc.com/id/01a0f0af-ee01-70bc-9a84-3c540b58af71)
  - [40 CFR 60.4915 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0af-ee03-77ee-a5a9-cc8f67bc9574)
  - [40 CFR 60.5190 How do I establish my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-ee53-745c-99dd-33bde45f7c3f)
  - [40 CFR 60.5225 What are the monitoring and calibration requirements for compliance with my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-ee5e-74a2-844e-fcc0a23f2c0e)
  - [40 CFR 62.15985 How do I establish my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-f856-7181-84b0-f0d44fd79ca6)
  - [40 CFR 62.16020 What are the monitoring and calibration requirements for compliance with my operating limits?](https://ontology.bommaritollc.com/id/01a0f0af-f863-7542-aa9e-6d44f46d69f9)
  - [40 CFR Table 5 to Subpart LLLL of Part 60 Summary of Reporting Requirements for New Sewage Sludge Incineration Units a](https://ontology.bommaritollc.com/id/01a0f0af-ee10-77c6-aa20-888947b48ed3)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1)
Cite as: 40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0af-edf7-72df-a61b-7b145cd991a1
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
