# 40 CFR 60.5195 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?

40 CFR 60.5195 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?, “By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?”, is a CFR section of [40 CFR Part 60, Subpart MMMM, Subject Group: Model Rule—Initial Compliance Requirements—Model Rule—Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b026-7478-a541-4bbeffa72e97); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 60—Part 60—Standards of performance for new stationary sources (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c782-777c-981a-1bcdc4e34a0f) › [40 CFR Part 60, Subpart MMMM—Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units](https://ontology.bommaritollc.com/id/01a0f0af-b01a-7084-a4b4-c17b866de93f) › [40 CFR Part 60, Subpart MMMM, Subject Group: Model Rule—Initial Compliance Requirements—Model Rule—Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b026-7478-a541-4bbeffa72e97)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 60.5195](https://ontology.bommaritollc.com/id/01a0f0af-ee55-7160-98f5-dbf0fbd8da75)
- `eli:cites`: [40 CFR 60.5220 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?](https://ontology.bommaritollc.com/id/01a0f0af-ee5c-7258-9c4b-87941eae1c5c)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd85f6ac26e)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-9e16-717f-9c3b-f5126e4e3b5c)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-53f1-73a2-b228-1e59c6cf1dff)
  - [evidence from https://www.govinfo.gov/link/cfr/40/60?sectionnum=5195&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-df3a-737b-8b80-20c8c69af87e)
- `schema:isPartOf`: [40 CFR Part 60, Subpart MMMM, Subject Group: Model Rule—Initial Compliance Requirements—Model Rule—Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b026-7478-a541-4bbeffa72e97)
- `schema:legislationIdentifier`: 40 CFR 60.5195
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/60?sectionnum=5195&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/60?sectionnum=5195&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 60.5195 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/60?sectionnum=5195&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (2; `eli:cites`):
  - [40 CFR 60.5230 What records must I keep?](https://ontology.bommaritollc.com/id/01a0f0af-ee60-74f7-ac64-a11e21a44524)
  - [40 CFR 60.5235 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0af-ee62-71e0-85df-bebc2b124a0d)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209)
Cite as: 40 CFR 60.5195 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0af-ee54-776e-a7f4-acd929073209
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
