Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 60.5413a What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities?
40 CFR 60.5413a What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities?, “What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal…”, is a CFR section of 40 CFR Part 60, Subpart OOOOa—Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After September 18, 2015 and On or Before December 6, 2022; in force.
https://ontology.bommaritollc.com/id/01a0f0af-eed2-772b-9a91-6410a696f2e2
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 60.5413a |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities?en |
| schema:url | |
| skos:prefLabel | 40 CFR 60.5413a What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities?en |
Related
Cited by (7)eli:cites
- 40 CFR 49.105 Requirements.
- 40 CFR 60.17 Incorporations by reference.
- 40 CFR 60.5410a How do I demonstrate initial compliance with the standards for my well, centrifugal compressor, reciprocating compressor, pneumatic controller, pneumatic pump, storage vessel, collection of fugitive emissions components at a well site, collection of fugitive emissions components at a compressor station, and equipment leaks at onshore natural gas processing plants and sweetening unit affected facilities?
- 40 CFR 60.5412a What additional requirements must I meet for determining initial compliance with control devices used to comply with the emission standards for my centrifugal compressor, and storage vessel affected facilities?
- 40 CFR 60.5415a How do I demonstrate continuous compliance with the standards for my well, centrifugal compressor, reciprocating compressor, pneumatic controller, pneumatic pump, storage vessel, collection of fugitive emissions components at a well site, and collection of fugitive emissions components at a compressor station affected facilities, equipment leaks at onshore natural gas processing plants and sweetening unit affected facilities?
- 40 CFR 60.5417a What are the continuous control device monitoring requirements for my centrifugal compressor and storage vessel affected facilities?
- 40 CFR 60.5420a What are my notification, reporting, and recordkeeping requirements?