Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 60.5413c What are the performance testing procedures for control devices?
40 CFR 60.5413c What are the performance testing procedures for control devices?, “What are the performance testing procedures for control devices?”, is a CFR section of 40 CFR Part 60, Subpart OOOOc, Subject Group: Model Rule—Initial Compliance Requirements—Model Rule—Initial Compliance Requirements; in force.
https://ontology.bommaritollc.com/id/01a0f0af-ef80-773b-a3f1-6d8f6bbad730
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 60.5413c |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | What are the performance testing procedures for control devices?en |
| schema:url | |
| skos:prefLabel | 40 CFR 60.5413c What are the performance testing procedures for control devices?en |
Related
Cited by (6)eli:cites
- 40 CFR 60.17 Incorporations by reference.
- 40 CFR 60.5410c How do I demonstrate initial compliance with the standards for each of my designated facilities?
- 40 CFR 60.5412c What additional requirements must I meet for determining initial compliance of my control devices?
- 40 CFR 60.5415c How do I demonstrate continuous compliance with the standards for each of my designated facilities?
- 40 CFR 60.5417c What are the continuous monitoring requirements for my control devices?
- 40 CFR 60.5420c What are my notification, reporting, and recordkeeping requirements?