# 40 CFR 63.3967 How do I establish the emission capture system and add-on control device operating limits during the performance test?

40 CFR 63.3967 How do I establish the emission capture system and add-on control device operating limits during the performance test?, “How do I establish the emission capture system and add-on control device operating limits during the performance test?”, is a CFR section of [40 CFR Part 63, Subpart MMMM, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b6de-7593-9724-19eb541e5d94); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart MMMM—National Emission Standards for Hazardous Air Pollutants for Surface Coating of Miscellaneous Metal Parts and Products](https://ontology.bommaritollc.com/id/01a0f0af-b6d5-770e-aac0-135eaf93e7db) › [40 CFR Part 63, Subpart MMMM, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b6de-7593-9724-19eb541e5d94)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.3967](https://ontology.bommaritollc.com/id/01a0f0b0-01d6-760a-8435-d0f6f90bef7b)
- `eli:cites`:
  - [40 CFR 63.8 Monitoring requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f89e-7661-b752-bf5dd17c4893)
  - [40 CFR 63.3892 What operating limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-01bd-7720-b631-bdae7aa544d8)
  - [40 CFR 63.3960 By what date must I conduct performance tests and other initial compliance demonstrations?](https://ontology.bommaritollc.com/id/01a0f0b0-01cd-71f5-aa26-165615bae7b5)
  - [40 CFR 63.3964 What are the general requirements for performance tests?](https://ontology.bommaritollc.com/id/01a0f0b0-01d0-74b5-bd5f-42e0971528f0)
  - [40 CFR 63.3965 How do I determine the emission capture system efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-01d2-745b-9eab-d6d74a7c3519)
  - [40 CFR 63.3966 How do I determine the add-on control device emission destruction or removal efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-01d3-71d1-a958-ed2900a207aa)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-01d4-75a2-b030-34529be222e6)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a24d-756e-91dc-2e18002a54e0)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5e9c-7317-be06-82eede308411)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=3967&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e243-7443-b161-1aa42bac30db)
- `schema:isPartOf`: [40 CFR Part 63, Subpart MMMM, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b6de-7593-9724-19eb541e5d94)
- `schema:legislationIdentifier`: 40 CFR 63.3967
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: How do I establish the emission capture system and add-on control device operating limits during the performance test?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=3967&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=3967&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.3967 How do I establish the emission capture system and add-on control device operating limits during the performance test?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=3967&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (9; `eli:cites`):
  - [40 CFR 63.3892 What operating limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-01bd-7720-b631-bdae7aa544d8)
  - [40 CFR 63.3930 What records must I keep?](https://ontology.bommaritollc.com/id/01a0f0b0-01c2-75b7-a290-8d6f92c09342)
  - [40 CFR 63.3960 By what date must I conduct performance tests and other initial compliance demonstrations?](https://ontology.bommaritollc.com/id/01a0f0b0-01cd-71f5-aa26-165615bae7b5)
  - [40 CFR 63.3961 How do I demonstrate initial compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-01ce-70ec-bebb-28e0f8b7b1d2)
  - [40 CFR 63.3968 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?](https://ontology.bommaritollc.com/id/01a0f0b0-01d6-760a-8435-d0f8e66758de)
  - [40 CFR 63.4568 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?](https://ontology.bommaritollc.com/id/01a0f0b0-0263-7270-9565-b8bcb369794d)
  - [40 CFR Appendix A to Subpart MMMM of Part 63 Alternative Capture Efficiency and Destruction Efficiency Measurement and Monitoring Procedures for Magnet Wire Coating Operations](https://ontology.bommaritollc.com/id/01a0f0b0-01e1-73e1-9ed8-5b4642385922)
  - [40 CFR Table 1 to Subpart MMMM of Part 63 Operating Limits if Using the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0b0-01da-7324-867f-9f4dca7044db)
  - [40 CFR Table 2 to Subpart MMMM of Part 63 Applicability of General Provisions to Subpart MMMM of Part 63](https://ontology.bommaritollc.com/id/01a0f0b0-01dc-77da-aea2-ebbadbd832de)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1)
Cite as: 40 CFR 63.3967 How do I establish the emission capture system and add-on control device operating limits during the performance test?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-01d5-761b-8060-2a7bd15e91f1
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
