# 40 CFR 63.4540 By what date must I conduct the initial compliance demonstration?

40 CFR 63.4540 By what date must I conduct the initial compliance demonstration?, “By what date must I conduct the initial compliance demonstration?”, is a CFR section of [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Compliant Material Option—Compliance Requirements for the Compliant Material Option](https://ontology.bommaritollc.com/id/01a0f0af-b70b-72e9-b560-5d9f27f46409); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart PPPP—National Emission Standards for Hazardous Air Pollutants for Surface Coating of Plastic Parts and Products](https://ontology.bommaritollc.com/id/01a0f0af-b702-70e3-81b0-0ae8718d99b5) › [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Compliant Material Option—Compliance Requirements for the Compliant Material Option](https://ontology.bommaritollc.com/id/01a0f0af-b70b-72e9-b560-5d9f27f46409)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.4540](https://ontology.bommaritollc.com/id/01a0f0b0-0250-72f5-889a-30b43685215c)
- `eli:cites`:
  - [40 CFR 63.4483 When do I have to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-023e-75a5-b79c-01865c3fe727)
  - [40 CFR 63.4490 What emission limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-0240-7242-9ae3-a5edbaa7756a)
  - [40 CFR 63.4541 How do I demonstrate initial compliance with the emission limitations?](https://ontology.bommaritollc.com/id/01a0f0b0-0250-72f5-889a-30b60b7bee0e)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247adbac387f)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a26a-702d-b772-2b64fb570231)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5f10-774a-8067-a05b3a2a0184)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=4540&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e259-73cc-935b-2e17b2dd2d7b)
- `schema:isPartOf`: [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Compliant Material Option—Compliance Requirements for the Compliant Material Option](https://ontology.bommaritollc.com/id/01a0f0af-b70b-72e9-b560-5d9f27f46409)
- `schema:legislationIdentifier`: 40 CFR 63.4540
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: By what date must I conduct the initial compliance demonstration?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=4540&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4540&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.4540 By what date must I conduct the initial compliance demonstration?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4540&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (5; `eli:cites`):
  - [40 CFR 63.4483 When do I have to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-023e-75a5-b79c-01865c3fe727)
  - [40 CFR 63.4491 What are my options for meeting the emission limits?](https://ontology.bommaritollc.com/id/01a0f0b0-0241-7273-80f1-5f5738465316)
  - [40 CFR 63.4510 What notifications must I submit?](https://ontology.bommaritollc.com/id/01a0f0b0-0249-72c9-8b6a-2c7451340524)
  - [40 CFR 63.4520 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0b0-024b-7631-92c6-2004ebec7fb8)
  - [40 CFR 63.4542 How do I demonstrate continuous compliance with the emission limitations?](https://ontology.bommaritollc.com/id/01a0f0b0-0252-77bc-a40c-a91030de32b8)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2)
Cite as: 40 CFR 63.4540 By what date must I conduct the initial compliance demonstration?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-024f-733b-9681-247bb02a03e2
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
