# 40 CFR 63.4560 By what date must I conduct performance tests and initial compliance demonstrations?

40 CFR 63.4560 By what date must I conduct performance tests and initial compliance demonstrations?, “By what date must I conduct performance tests and initial compliance demonstrations?”, is a CFR section of [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b70f-774d-ae87-bebb477b3336); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart PPPP—National Emission Standards for Hazardous Air Pollutants for Surface Coating of Plastic Parts and Products](https://ontology.bommaritollc.com/id/01a0f0af-b702-70e3-81b0-0ae8718d99b5) › [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b70f-774d-ae87-bebb477b3336)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.4560](https://ontology.bommaritollc.com/id/01a0f0b0-0259-70ff-b0c2-4c0b9381960e)
- `eli:cites`:
  - [40 CFR Part 40—Research and demonstration grants](https://ontology.bommaritollc.com/id/01a0f0af-c762-7538-8427-6bda1b92807b)
  - [40 CFR Part 70—State operating permit programs](https://ontology.bommaritollc.com/id/01a0f0af-c793-741d-91a7-12cdf7efa2d4)
  - [40 CFR Part 71—Federal operating permit programs](https://ontology.bommaritollc.com/id/01a0f0af-c794-77dd-be20-955cc17dcc8c)
  - [40 CFR 63.4483 When do I have to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-023e-75a5-b79c-01865c3fe727)
  - [40 CFR 63.4490 What emission limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-0240-7242-9ae3-a5edbaa7756a)
  - [40 CFR 63.4492 What operating limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-0243-7389-988c-aa9c4c724d46)
  - [40 CFR 63.4493 What work practice standards must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-0244-7750-a739-33315f8f7c58)
  - [40 CFR 63.4561 How do I demonstrate initial compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-0259-70ff-b0c2-4c0d22361df9)
  - [40 CFR 63.4564 What are the general requirements for performance tests?](https://ontology.bommaritollc.com/id/01a0f0b0-025d-7497-816e-5d71a3505819)
  - [40 CFR 63.4565 How do I determine the emission capture system efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-025f-705c-ac13-50a2d61413d1)
  - [40 CFR 63.4566 How do I determine the add-on control device emission destruction or removal efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-0260-726d-bb50-78dbeafb682e)
  - [40 CFR 63.4567 How do I establish the emission capture system and add-on control device operating limits during the performance test?](https://ontology.bommaritollc.com/id/01a0f0b0-0261-72fe-9fbf-cfe349016ece)
  - [40 CFR 63.4568 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?](https://ontology.bommaritollc.com/id/01a0f0b0-0263-7270-9565-b8bcb369794d)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f7fd8dacb3d)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a26b-7193-bf43-266fe85d0aa8)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5f18-76d8-9c17-af929003524e)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=4560&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e25a-77a0-adf9-211d29f5a0f1)
- `schema:isPartOf`: [40 CFR Part 63, Subpart PPPP, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b70f-774d-ae87-bebb477b3336)
- `schema:legislationIdentifier`: 40 CFR 63.4560
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: By what date must I conduct performance tests and initial compliance demonstrations?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=4560&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4560&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.4560 By what date must I conduct performance tests and initial compliance demonstrations?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4560&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (12; `eli:cites`):
  - [40 CFR 63.4483 When do I have to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-023e-75a5-b79c-01865c3fe727)
  - [40 CFR 63.4491 What are my options for meeting the emission limits?](https://ontology.bommaritollc.com/id/01a0f0b0-0241-7273-80f1-5f5738465316)
  - [40 CFR 63.4492 What operating limits must I meet?](https://ontology.bommaritollc.com/id/01a0f0b0-0243-7389-988c-aa9c4c724d46)
  - [40 CFR 63.4510 What notifications must I submit?](https://ontology.bommaritollc.com/id/01a0f0b0-0249-72c9-8b6a-2c7451340524)
  - [40 CFR 63.4520 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0b0-024b-7631-92c6-2004ebec7fb8)
  - [40 CFR 63.4561 How do I demonstrate initial compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-0259-70ff-b0c2-4c0d22361df9)
  - [40 CFR 63.4563 How do I demonstrate continuous compliance with the emission limitations?](https://ontology.bommaritollc.com/id/01a0f0b0-025c-7626-a757-5dafaadc261d)
  - [40 CFR 63.4564 What are the general requirements for performance tests?](https://ontology.bommaritollc.com/id/01a0f0b0-025d-7497-816e-5d71a3505819)
  - [40 CFR 63.4565 How do I determine the emission capture system efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-025f-705c-ac13-50a2d61413d1)
  - [40 CFR 63.4566 How do I determine the add-on control device emission destruction or removal efficiency?](https://ontology.bommaritollc.com/id/01a0f0b0-0260-726d-bb50-78dbeafb682e)
  - [40 CFR 63.4567 How do I establish the emission capture system and add-on control device operating limits during the performance test?](https://ontology.bommaritollc.com/id/01a0f0b0-0261-72fe-9fbf-cfe349016ece)
  - [40 CFR Table 2 to Subpart PPPP of Part 63 Applicability of General Provisions to Subpart PPPP of Part 63](https://ontology.bommaritollc.com/id/01a0f0b0-0269-72ee-b4c9-a62286aa747e)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47)
Cite as: 40 CFR 63.4560 By what date must I conduct performance tests and initial compliance demonstrations?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-0258-7259-a024-5f8058e2cd47
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
