# 40 CFR 63.4768 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?

40 CFR 63.4768 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?, “What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?”, is a CFR section of [40 CFR Part 63, Subpart QQQQ, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b71a-71f4-87e7-4dfe1290a021); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart QQQQ—National Emission Standards for Hazardous Air Pollutants: Surface Coating of Wood Building Products](https://ontology.bommaritollc.com/id/01a0f0af-b712-77b9-a8a7-2f9a9a253e3d) › [40 CFR Part 63, Subpart QQQQ, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b71a-71f4-87e7-4dfe1290a021)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.4768](https://ontology.bommaritollc.com/id/01a0f0b0-0298-7018-83e1-bccd5a1e5155)
- `eli:cites`:
  - [40 CFR 63.4720 What reports must I submit?](https://ontology.bommaritollc.com/id/01a0f0b0-0280-741b-9ebe-6111f6935700)
  - [40 CFR 63.4767 How do I establish the emission capture system and add-on control device operating limits during the performance test?](https://ontology.bommaritollc.com/id/01a0f0b0-0295-7356-97fe-e46a0b1125cc)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540d7ea26ce5)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a2b4-76e5-9634-cdc62d65dbc3)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5f4a-75fb-aca6-88b7f9a615ac)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=4768&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e264-7759-a357-37395dcfa68d)
- `schema:isPartOf`: [40 CFR Part 63, Subpart QQQQ, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b71a-71f4-87e7-4dfe1290a021)
- `schema:legislationIdentifier`: 40 CFR 63.4768
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=4768&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4768&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.4768 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4768&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (5; `eli:cites`):
  - [40 CFR 63.4760 By what date must I conduct performance tests and other initial compliance demonstrations?](https://ontology.bommaritollc.com/id/01a0f0b0-028a-70d1-8bd6-dfa986e91d07)
  - [40 CFR 63.4761 How do I demonstrate initial compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-028c-7498-ba0b-84f25fde5355)
  - [40 CFR 63.4763 How do I demonstrate continuous compliance with the emission limitations?](https://ontology.bommaritollc.com/id/01a0f0b0-028f-7444-a26a-bfdf6881e5b9)
  - [40 CFR Table 3 to Subpart QQQQ of Part 63 Operating Limits if Using the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0b0-029c-7695-875e-02e746477bad)
  - [40 CFR Table 4 to Subpart QQQQ of Part 63 Applicability of General Provisions to Subpart QQQQ of Part 63](https://ontology.bommaritollc.com/id/01a0f0b0-029d-77e2-a27b-e60f343abe38)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989)
Cite as: 40 CFR 63.4768 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-0296-7701-a4cc-540e42c86989
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
