# 40 CFR 63.4965 How do I determine the add-on control device emission destruction or removal efficiency?

40 CFR 63.4965 How do I determine the add-on control device emission destruction or removal efficiency?, “How do I determine the add-on control device emission destruction or removal efficiency?”, is a CFR section of [40 CFR Part 63, Subpart RRRR, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b729-7003-9015-99aa41ba579c); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart RRRR—National Emission Standards for Hazardous Air Pollutants: Surface Coating of Metal Furniture](https://ontology.bommaritollc.com/id/01a0f0af-b71e-72a5-9d6b-0264f70bdf5d) › [40 CFR Part 63, Subpart RRRR, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b729-7003-9015-99aa41ba579c)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.4965](https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a30f8ed3244b)
- `eli:cites`:
  - [40 CFR 63.7 Performance testing requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f89c-70bc-a8cc-97a3518e9ae9)
  - [40 CFR 63.14 Incorporations by reference.](https://ontology.bommaritollc.com/id/01a0f0af-f8a9-74eb-9805-19668ace2269)
  - [40 CFR 63.4960 By what date must I conduct initial performance tests and other initial compliance demonstrations?](https://ontology.bommaritollc.com/id/01a0f0b0-0301-7770-94e9-1171f246460f)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-0309-74e4-9b75-5881e076fe9c)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a2bd-7196-8276-9c31b22691ff)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5f76-724d-84aa-ff1f7229aaeb)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=4965&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e26c-77c8-b19f-83aa83e61ee3)
- `schema:isPartOf`: [40 CFR Part 63, Subpart RRRR, Subject Group: Compliance Requirements for the Emission Rate With Add-On Controls Option—Compliance Requirements for the Emission Rate With Add-On Controls Option](https://ontology.bommaritollc.com/id/01a0f0af-b729-7003-9015-99aa41ba579c)
- `schema:legislationIdentifier`: 40 CFR 63.4965
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: How do I determine the add-on control device emission destruction or removal efficiency?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=4965&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4965&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.4965 How do I determine the add-on control device emission destruction or removal efficiency?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=4965&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (8; `eli:cites`):
  - [40 CFR 63.4891 What are my options for demonstrating compliance with the emission limits?](https://ontology.bommaritollc.com/id/01a0f0b0-02ab-72f5-a281-03b05d6561c8)
  - [40 CFR 63.4930 What records must I keep?](https://ontology.bommaritollc.com/id/01a0f0b0-02f7-7295-82c9-b749c3b8b25a)
  - [40 CFR 63.4960 By what date must I conduct initial performance tests and other initial compliance demonstrations?](https://ontology.bommaritollc.com/id/01a0f0b0-0301-7770-94e9-1171f246460f)
  - [40 CFR 63.4961 How do I demonstrate initial compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-0302-77d8-b22d-f57ff1dd0d2e)
  - [40 CFR 63.4962 How do I conduct periodic performance tests and demonstrate continuous compliance with the emission limitations?](https://ontology.bommaritollc.com/id/01a0f0b0-0305-7662-a8b3-b0cef800fe03)
  - [40 CFR 63.4963 What are the general requirements for performance tests?](https://ontology.bommaritollc.com/id/01a0f0b0-0307-72bb-b698-ee0ed976b6c5)
  - [40 CFR 63.4966 How do I establish the emission capture system and add-on control device operating limits during performance tests?](https://ontology.bommaritollc.com/id/01a0f0b0-030b-74a4-9bd7-33ffdd3c0686)
  - [40 CFR Table 2 to Subpart RRRR of Part 63 Applicability of General Provisions to Subpart RRRR](https://ontology.bommaritollc.com/id/01a0f0b0-0313-724e-8f75-952848ad99b4)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4)
Cite as: 40 CFR 63.4965 How do I determine the add-on control device emission destruction or removal efficiency?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-030a-7445-a8e8-a3048698cdc4
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
