# 40 CFR 63.5707 What is an implementation plan for open molding operations and when do I need to prepare one?

40 CFR 63.5707 What is an implementation plan for open molding operations and when do I need to prepare one?, “What is an implementation plan for open molding operations and when do I need to prepare one?”, is a CFR section of [40 CFR Part 63, Subpart VVVV, Subject Group: Standards for Open Molding Resin and Gel Coat Operations—Standards for Open Molding Resin and Gel Coat Operations](https://ontology.bommaritollc.com/id/01a0f0af-b750-701c-869c-c5931c8a2906); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart VVVV—National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing](https://ontology.bommaritollc.com/id/01a0f0af-b74e-72d3-b7cc-783879b38f5d) › [40 CFR Part 63, Subpart VVVV, Subject Group: Standards for Open Molding Resin and Gel Coat Operations—Standards for Open Molding Resin and Gel Coat Operations](https://ontology.bommaritollc.com/id/01a0f0af-b750-701c-869c-c5931c8a2906)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.5707](https://ontology.bommaritollc.com/id/01a0f0b0-039e-7424-b382-ab30f8578624)
- `eli:cites`:
  - [40 CFR 63.5698 What emission limit must I meet for open molding resin and gel coat operations?](https://ontology.bommaritollc.com/id/01a0f0b0-0398-75c6-b9b4-723cbedd9e0e)
  - [40 CFR 63.5704 What are the general requirements for complying with the open molding emission limit?](https://ontology.bommaritollc.com/id/01a0f0b0-039b-7772-ba1b-de37fc86c04a)
  - [40 CFR 63.5761 What notifications must I submit and when?](https://ontology.bommaritollc.com/id/01a0f0b0-03ba-72aa-bb3b-86b9685bbd0d)
  - [40 CFR 63.5764 What reports must I submit and when?](https://ontology.bommaritollc.com/id/01a0f0b0-03bb-738b-9c66-83395842117a)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-039c-735c-9d7f-6da3b15f33bf)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a2df-7154-807b-1fdf7387b38f)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-5fc8-7249-9f2c-34d686aaad07)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=5707&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e2af-7190-8dc0-413a8a4d2a87)
- `schema:isPartOf`: [40 CFR Part 63, Subpart VVVV, Subject Group: Standards for Open Molding Resin and Gel Coat Operations—Standards for Open Molding Resin and Gel Coat Operations](https://ontology.bommaritollc.com/id/01a0f0af-b750-701c-869c-c5931c8a2906)
- `schema:legislationIdentifier`: 40 CFR 63.5707
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What is an implementation plan for open molding operations and when do I need to prepare one?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=5707&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=5707&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.5707 What is an implementation plan for open molding operations and when do I need to prepare one?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=5707&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (1; `eli:cites`):
  - [40 CFR 63.5704 What are the general requirements for complying with the open molding emission limit?](https://ontology.bommaritollc.com/id/01a0f0b0-039b-7772-ba1b-de37fc86c04a)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5)
Cite as: 40 CFR 63.5707 What is an implementation plan for open molding operations and when do I need to prepare one?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-039d-715e-8598-b1cf8aac23f5
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
