# 40 CFR 63.6625 What are my monitoring, installation, collection, operation, and maintenance requirements?

40 CFR 63.6625 What are my monitoring, installation, collection, operation, and maintenance requirements?, “What are my monitoring, installation, collection, operation, and maintenance requirements?”, is a CFR section of [40 CFR Part 63, Subpart ZZZZ, Subject Group: Testing and Initial Compliance Requirements—Testing and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b7d5-75fa-a5b0-4ea83e08d8df); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart ZZZZ—National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines](https://ontology.bommaritollc.com/id/01a0f0af-b7d0-7295-b289-5a17dfcd0766) › [40 CFR Part 63, Subpart ZZZZ, Subject Group: Testing and Initial Compliance Requirements—Testing and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b7d5-75fa-a5b0-4ea83e08d8df)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.6625](https://ontology.bommaritollc.com/id/01a0f0b0-04c3-7004-8eed-8b2e6999f2d7)
- `eli:cites`:
  - [40 CFR Part 60—Part 60—Standards of performance for new stationary sources (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c782-777c-981a-1bcdc4e34a0f)
  - [40 CFR 63.2 Definitions.](https://ontology.bommaritollc.com/id/01a0f0af-f892-7738-88be-43fdd49240de)
  - [40 CFR 63.8 Monitoring requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f89e-7661-b752-bf5dd17c4893)
  - [40 CFR 63.9 Notification requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f8a0-738b-9623-7ec422fc8475)
  - [40 CFR 63.10 Recordkeeping and reporting requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f8a2-76e6-ac2b-f9b77a65c893)
  - [40 CFR 63.6603 What emission limitations, operating limitations, and other requirements must I meet if I own or operate an existing stationary RICE located at an area source of HAP emissions?](https://ontology.bommaritollc.com/id/01a0f0b0-04b5-74fc-b9cf-a82111dcd109)
  - [40 CFR 63.6635 How do I monitor and collect data to demonstrate continuous compliance?](https://ontology.bommaritollc.com/id/01a0f0b0-04c5-7704-9c8d-da44262fc58e)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afc9d85b4ce)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a31e-7329-bac3-6dbf9e85d168)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-6037-7029-b640-98322d4b1a42)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=6625&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e2e1-74d4-a9bf-e8ba6f971498)
- `schema:isPartOf`: [40 CFR Part 63, Subpart ZZZZ, Subject Group: Testing and Initial Compliance Requirements—Testing and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b7d5-75fa-a5b0-4ea83e08d8df)
- `schema:legislationIdentifier`: 40 CFR 63.6625
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What are my monitoring, installation, collection, operation, and maintenance requirements?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=6625&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=6625&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.6625 What are my monitoring, installation, collection, operation, and maintenance requirements?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=6625&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (7; `eli:cites`):
  - [40 CFR 63.6590 What parts of my plant does this subpart cover?](https://ontology.bommaritollc.com/id/01a0f0b0-04ad-70f7-a167-23d2db08b0b5)
  - [40 CFR 63.6603 What emission limitations, operating limitations, and other requirements must I meet if I own or operate an existing stationary RICE located at an area source of HAP emissions?](https://ontology.bommaritollc.com/id/01a0f0b0-04b5-74fc-b9cf-a82111dcd109)
  - [40 CFR Table 2c to Subpart ZZZZ of Part 63 Requirements for Existing Compression Ignition Stationary RICE Located at a Major Source of HAP Emissions and Existing Spark Ignition Stationary RICE ≤500 HP Located at a Major Source of HAP Emissions](https://ontology.bommaritollc.com/id/01a0f0b0-04d9-7441-a887-1bb718b3b3bd)
  - [40 CFR Table 2d to Subpart ZZZZ of Part 63 Requirements for Existing Stationary RICE Located at Area Sources of HAP Emissions](https://ontology.bommaritollc.com/id/01a0f0b0-04dc-7008-8b05-de1b7c6928ec)
  - [40 CFR Table 5 to Subpart ZZZZ of Part 63 Initial Compliance With Emission Limitations, Operating Limitations, and Other Requirements](https://ontology.bommaritollc.com/id/01a0f0b0-04e1-75cb-b12f-0c4024626a4e)
  - [40 CFR Table 6 to Subpart ZZZZ of Part 63 Continuous Compliance With Emission Limitations, and Other Requirements](https://ontology.bommaritollc.com/id/01a0f0b0-04e2-75cc-bcd1-a7378afa1080)
  - [40 CFR Table 8 to Subpart ZZZZ of Part 63 Applicability of General Provisions to Subpart ZZZZ](https://ontology.bommaritollc.com/id/01a0f0b0-04e5-718a-bde3-966795146c57)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630)
Cite as: 40 CFR 63.6625 What are my monitoring, installation, collection, operation, and maintenance requirements?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-04c1-710d-ba4e-9afd22ecb630
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
