# 40 CFR 63.7525 What are my monitoring, installation, operation, and maintenance requirements?

40 CFR 63.7525 What are my monitoring, installation, operation, and maintenance requirements?, “What are my monitoring, installation, operation, and maintenance requirements?”, is a CFR section of [40 CFR Part 63, Subpart DDDDD, Subject Group: Testing, Fuel Analyses, and Initial Compliance Requirements—Testing, Fuel Analyses, and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b802-76e9-aa33-f28e7e338c7f); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65) › [40 CFR Part 63, Subpart DDDDD—National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters](https://ontology.bommaritollc.com/id/01a0f0af-b7fc-74c4-a47b-80e2bde95890) › [40 CFR Part 63, Subpart DDDDD, Subject Group: Testing, Fuel Analyses, and Initial Compliance Requirements—Testing, Fuel Analyses, and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b802-76e9-aa33-f28e7e338c7f)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 63.7525](https://ontology.bommaritollc.com/id/01a0f0b0-05d0-7298-89ec-aacf77cc32fc)
- `eli:cites`:
  - [40 CFR Part 60—Part 60—Standards of performance for new stationary sources (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c782-777c-981a-1bcdc4e34a0f)
  - [40 CFR Part 75—Continuous emission monitoring](https://ontology.bommaritollc.com/id/01a0f0af-c79b-708f-a0d4-eadcfd02d8a4)
  - [40 CFR 60.8 Performance tests.](https://ontology.bommaritollc.com/id/01a0f0af-e523-747d-abce-b7cab031b235)
  - [40 CFR 63.8 Monitoring requirements.](https://ontology.bommaritollc.com/id/01a0f0af-f89e-7661-b752-bf5dd17c4893)
  - [40 CFR 63.14 Incorporations by reference.](https://ontology.bommaritollc.com/id/01a0f0af-f8a9-74eb-9805-19668ace2269)
  - [40 CFR 63.7495 When do I have to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-05c1-75d8-953b-dc76f772ba0e)
  - [40 CFR 63.7505 What are my general requirements for complying with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-05c7-71cc-b17e-b41c7b5a3e24)
  - [40 CFR 63.7535 Is there a minimum amount of monitoring data I must obtain?](https://ontology.bommaritollc.com/id/01a0f0b0-05d2-743b-856a-3c5b1bfcbed8)
  - [40 CFR 63.7540 How do I demonstrate continuous compliance with the emission limitations, fuel specifications and work practice standards?](https://ontology.bommaritollc.com/id/01a0f0b0-05d4-77ca-abcc-9c9d01e2811e)
  - [40 CFR 63.7575 What definitions apply to this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-05e1-744b-862a-40372eee60b8)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932c4c48668c)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a350-7746-ac7b-8f38c0298428)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-610c-7541-adca-f9892ba82b08)
  - [evidence from https://www.govinfo.gov/link/cfr/40/63?sectionnum=7525&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e2ff-70ab-ba16-876b498114ef)
- `schema:isPartOf`: [40 CFR Part 63, Subpart DDDDD, Subject Group: Testing, Fuel Analyses, and Initial Compliance Requirements—Testing, Fuel Analyses, and Initial Compliance Requirements](https://ontology.bommaritollc.com/id/01a0f0af-b802-76e9-aa33-f28e7e338c7f)
- `schema:legislationIdentifier`: 40 CFR 63.7525
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What are my monitoring, installation, operation, and maintenance requirements?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/63?sectionnum=7525&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/63?sectionnum=7525&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 63.7525 What are my monitoring, installation, operation, and maintenance requirements?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/63?sectionnum=7525&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (16; `eli:cites`):
  - [40 CFR 63.7505 What are my general requirements for complying with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-05c7-71cc-b17e-b41c7b5a3e24)
  - [40 CFR 63.7510 What are my initial compliance requirements and by what date must I conduct them?](https://ontology.bommaritollc.com/id/01a0f0b0-05c8-708f-9067-f6e660779bd9)
  - [40 CFR 63.7515 When must I conduct subsequent performance tests, fuel analyses, or tune-ups?](https://ontology.bommaritollc.com/id/01a0f0b0-05ca-77ab-a783-9564e8d435c6)
  - [40 CFR 63.7522 Can I use emissions averaging to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-05cd-70d5-8d1b-415d9e148b54)
  - [40 CFR 63.7530 How do I demonstrate initial compliance with the emission limitations, fuel specifications and work practice standards?](https://ontology.bommaritollc.com/id/01a0f0b0-05d0-7298-89ec-aad13e178170)
  - [40 CFR 63.7540 How do I demonstrate continuous compliance with the emission limitations, fuel specifications and work practice standards?](https://ontology.bommaritollc.com/id/01a0f0b0-05d4-77ca-abcc-9c9d01e2811e)
  - [40 CFR Table 1 to Subpart DDDDD of Part 63 Emission Limits for New or Reconstructed Boilers and Process Heaters c](https://ontology.bommaritollc.com/id/01a0f0b0-05e2-778d-af38-745165582cb6)
  - [40 CFR Table 11 to Subpart DDDDD of Part 63 Alternative Emission Limits for New or Reconstructed Boilers and Process Heaters That Commenced Construction or Reconstruction After June 4, 2010, and Before May 20, 2011](https://ontology.bommaritollc.com/id/01a0f0b0-05f1-75f0-9bcb-7c36c6b4a9d9)
  - [40 CFR Table 12 to Subpart DDDDD of Part 63 Alternative Emission Limits for New or Reconstructed Boilers and Process Heaters That Commenced Construction or Reconstruction After May 20, 2011, and Before December 23, 2011](https://ontology.bommaritollc.com/id/01a0f0b0-05f3-73b0-95c1-c64796f81436)
  - [40 CFR Table 13 to Subpart DDDDD of Part 63 Alternative Emission Limits for New or Reconstructed Boilers and Process Heaters That Commenced Construction or Reconstruction After December 23, 2011, and Before April 1, 2013](https://ontology.bommaritollc.com/id/01a0f0b0-05f4-74ff-aac6-b3d2b9abdf57)
  - [40 CFR Table 14 to Subpart DDDDD of Part 63 Alternative Emission Limits for New or Reconstructed Boilers and Process Heaters c](https://ontology.bommaritollc.com/id/01a0f0b0-05f6-72c8-9905-07cd4490cd88)
  - [40 CFR Table 15 to Subpart DDDDD of Part 63 Alternative Emission Limits for Existing Boilers and Process Heaters d](https://ontology.bommaritollc.com/id/01a0f0b0-05f7-77ca-bf8b-a0bf693733ba)
  - [40 CFR Table 2 to Subpart DDDDD of Part 63 Emission Limits for Existing Boilers and Process Heaters d](https://ontology.bommaritollc.com/id/01a0f0b0-05e4-76dc-b575-cb18ed5f3187)
  - [40 CFR Table 4 to Subpart DDDDD of Part 63 Operating Limits for Boilers and Process Heaters](https://ontology.bommaritollc.com/id/01a0f0b0-05e6-75d6-9217-f549b25e9e00)
  - [40 CFR Table 7 to Subpart DDDDD of Part 63 Establishing Operating Limits a b](https://ontology.bommaritollc.com/id/01a0f0b0-05eb-768a-937b-335613fdf055)
  - [40 CFR Table 8 to Subpart DDDDD of Part 63 Demonstrating Continuous Compliance](https://ontology.bommaritollc.com/id/01a0f0b0-05ec-76ed-a329-99615a499049)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961)
Cite as: 40 CFR 63.7525 What are my monitoring, installation, operation, and maintenance requirements?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-05ce-71e8-8bf7-932dca478961
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
