# 40 CFR 65.6 Startup, shutdown, and malfunction plan and procedures.

40 CFR 65.6 Startup, shutdown, and malfunction plan and procedures., “Startup, shutdown, and malfunction plan and procedures”, is a CFR section of [40 CFR Part 65, Subpart A—General Provisions](https://ontology.bommaritollc.com/id/01a0f0af-b9ce-71f7-9bf4-8a2a4b841116); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 65—Consolidated Federal air rule](https://ontology.bommaritollc.com/id/01a0f0af-c78b-7316-9133-7f0242cd15ba) › [40 CFR Part 65, Subpart A—General Provisions](https://ontology.bommaritollc.com/id/01a0f0af-b9ce-71f7-9bf4-8a2a4b841116)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 65.6](https://ontology.bommaritollc.com/id/01a0f0b0-0be0-77e3-9260-ecee59e646cb)
- `eli:cites`:
  - [40 CFR Part 63—National emission standards for hazardous air pollutants for source categories (Continued)](https://ontology.bommaritollc.com/id/01a0f0af-c788-70a6-b17a-7a43cb946b65)
  - [40 CFR Part 65—Consolidated Federal air rule](https://ontology.bommaritollc.com/id/01a0f0af-c78b-7316-9133-7f0242cd15ba)
  - [40 CFR 65.1 Applicability.](https://ontology.bommaritollc.com/id/01a0f0b0-0bd6-72b7-a1d6-7b86db6bec44)
  - [40 CFR 65.3 Compliance with standards and operation and maintenance requirements.](https://ontology.bommaritollc.com/id/01a0f0b0-0bda-74dc-a405-a529683ffa16)
  - [40 CFR 65.5 Reporting requirements.](https://ontology.bommaritollc.com/id/01a0f0b0-0bde-72a8-80df-1a1b3d7f8818)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-0bde-72a8-80df-1a274a1d42d1)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a4d3-74cf-b554-a66ec31d69ce)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-64d7-77e9-b543-694adbc8e706)
  - [evidence from https://www.govinfo.gov/link/cfr/40/65?sectionnum=6&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e409-705b-a5bd-1c9917914267)
- `schema:isPartOf`: [40 CFR Part 65, Subpart A—General Provisions](https://ontology.bommaritollc.com/id/01a0f0af-b9ce-71f7-9bf4-8a2a4b841116)
- `schema:legislationIdentifier`: 40 CFR 65.6
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Startup, shutdown, and malfunction plan and procedures
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/65?sectionnum=6&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/65?sectionnum=6&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 65.6 Startup, shutdown, and malfunction plan and procedures.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/65?sectionnum=6&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (8; `eli:cites`):
  - [40 CFR 65.105 Leak repair.](https://ontology.bommaritollc.com/id/01a0f0b0-0c7c-7458-a351-64a751e07251)
  - [40 CFR 65.115 Standards: Closed vent systems and control devices; or emissions routed to a fuel gas system or process.](https://ontology.bommaritollc.com/id/01a0f0b0-0c8a-761c-8fd7-a035e3e45ee3)
  - [40 CFR 65.140 Applicability.](https://ontology.bommaritollc.com/id/01a0f0b0-0c95-7086-b90d-f127948b12ef)
  - [40 CFR 65.156 General monitoring requirements for control and recovery devices.](https://ontology.bommaritollc.com/id/01a0f0b0-0cae-77ba-b74a-69708d7a4cb8)
  - [40 CFR 65.167 Other reports.](https://ontology.bommaritollc.com/id/01a0f0b0-0cc1-74ab-ad07-a0424eac72e9)
  - [40 CFR 65.3 Compliance with standards and operation and maintenance requirements.](https://ontology.bommaritollc.com/id/01a0f0b0-0bda-74dc-a405-a529683ffa16)
  - [40 CFR 65.5 Reporting requirements.](https://ontology.bommaritollc.com/id/01a0f0b0-0bde-72a8-80df-1a1b3d7f8818)
  - [40 CFR Appendix 1 to Part 3 Priority Reports](https://ontology.bommaritollc.com/id/01a0f0af-cd1f-72f9-99ac-745448b1d2f8)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569)
Cite as: 40 CFR 65.6 Startup, shutdown, and malfunction plan and procedures.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-0bdf-70da-bf20-c73dde45b569
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
