# 40 CFR 74.10 Roles—EPA and permitting authority.

40 CFR 74.10 Roles—EPA and permitting authority., “Roles—EPA and permitting authority”, is a CFR section of [40 CFR Part 74, Subpart B—Permitting Procedures](https://ontology.bommaritollc.com/id/01a0f0af-ba18-777a-b313-87ed699c4f63); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter C—AIR PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-ad8e-76fe-9ab3-e061022e41a6) › [40 CFR Part 74—Sulfur dioxide opt-ins](https://ontology.bommaritollc.com/id/01a0f0af-c799-76ae-9938-65876572b070) › [40 CFR Part 74, Subpart B—Permitting Procedures](https://ontology.bommaritollc.com/id/01a0f0af-ba18-777a-b313-87ed699c4f63)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 74.10](https://ontology.bommaritollc.com/id/01a0f0b0-0e5e-702e-99e1-8f94bf8db2d2)
- `eli:cites`:
  - [40 CFR Part 74—Sulfur dioxide opt-ins](https://ontology.bommaritollc.com/id/01a0f0af-c799-76ae-9938-65876572b070)
  - [40 CFR 72.6 Applicability.](https://ontology.bommaritollc.com/id/01a0f0b0-0dc6-7261-9e3c-3aa54c19c99f)
  - [40 CFR 74.18 Withdrawal.](https://ontology.bommaritollc.com/id/01a0f0b0-0e98-7758-aa9c-c03c530e3bfc)
  - [40 CFR 74.20 Data for baseline and alternative baseline.](https://ontology.bommaritollc.com/id/01a0f0b0-0e9a-704a-84a7-995908b63878)
  - [40 CFR 74.46 Opt-in source permanent shutdown, reconstruction, or change in affected status.](https://ontology.bommaritollc.com/id/01a0f0b0-0eaa-726b-9d18-4076416ce3f0)
  - [40 CFR 74.50 Deducting opt-in source allowances from ATS accounts.](https://ontology.bommaritollc.com/id/01a0f0b0-0eb3-72b6-b0b1-2122fb6a4b37)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fcaa9beb22)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a52d-7380-9d0d-15aa8bf171a0)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-6618-724e-b80e-a6e5f8b5ed46)
  - [evidence from https://www.govinfo.gov/link/cfr/40/74?sectionnum=10&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e463-71f5-a171-5ea8b529bf86)
- `schema:isPartOf`: [40 CFR Part 74, Subpart B—Permitting Procedures](https://ontology.bommaritollc.com/id/01a0f0af-ba18-777a-b313-87ed699c4f63)
- `schema:legislationIdentifier`: 40 CFR 74.10
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Roles—EPA and permitting authority
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/74?sectionnum=10&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/74?sectionnum=10&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 74.10 Roles—EPA and permitting authority.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/74?sectionnum=10&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff)
Cite as: 40 CFR 74.10 Roles—EPA and permitting authority.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-0e5d-7304-b848-85fd8a41b5ff
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
