# 40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?

40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?, “As an owner or operator of a new facility, what must I do to comply with this subpart?”, is a CFR section of [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter D—WATER PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-bb6f-71da-ac29-5df7cbb70c27) › [40 CFR Part 125—Criteria and standards for the national pollutant discharge elimination system](https://ontology.bommaritollc.com/id/01a0f0af-c7ea-7538-a303-27951cad6119) › [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 125.84](https://ontology.bommaritollc.com/id/01a0f0b0-2005-73a7-9609-2941f48ce291)
- `eli:cites`:
  - [40 CFR 122.21 Application for a permit (applicable to State programs, see § 123.25).](https://ontology.bommaritollc.com/id/01a0f0b0-1f2c-7145-8166-1441827bcfd9)
  - [40 CFR 125.87 As an owner or operator of a new facility, must I perform monitoring?](https://ontology.bommaritollc.com/id/01a0f0b0-2008-70da-9431-029b5dae13ac)
  - [40 CFR 125.88 As an owner or operator of a new facility, must I keep records and report?](https://ontology.bommaritollc.com/id/01a0f0b0-200a-73b1-b9dc-6025d372e73f)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482af1b6d7e7)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a8e5-75b3-b7c0-98a96f886c81)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-6d39-706d-b26d-415bd5b59f53)
  - [evidence from https://www.govinfo.gov/link/cfr/40/125?sectionnum=84&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e746-7215-9c25-8ca1e33f536b)
- `schema:isPartOf`: [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323)
- `schema:legislationIdentifier`: 40 CFR 125.84
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: As an owner or operator of a new facility, what must I do to comply with this subpart?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/125?sectionnum=84&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/125?sectionnum=84&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/125?sectionnum=84&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (4; `eli:cites`):
  - [40 CFR 125.85 May alternative requirements be authorized?](https://ontology.bommaritollc.com/id/01a0f0b0-2006-7457-a5a1-7beea6e52e27)
  - [40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd)
  - [40 CFR 125.87 As an owner or operator of a new facility, must I perform monitoring?](https://ontology.bommaritollc.com/id/01a0f0b0-2008-70da-9431-029b5dae13ac)
  - [40 CFR 125.89 As the Director, what must I do to comply with the requirements of this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-200b-748b-b98c-847d00b27801)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4)
Cite as: 40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
