# 40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?

40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?, “As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES…”, is a CFR section of [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter D—WATER PROGRAMS](https://ontology.bommaritollc.com/id/01a0f0af-bb6f-71da-ac29-5df7cbb70c27) › [40 CFR Part 125—Criteria and standards for the national pollutant discharge elimination system](https://ontology.bommaritollc.com/id/01a0f0af-c7ea-7538-a303-27951cad6119) › [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 125.86](https://ontology.bommaritollc.com/id/01a0f0b0-2008-70da-9431-0299a9e88431)
- `eli:cites`:
  - [40 CFR 122.21 Application for a permit (applicable to State programs, see § 123.25).](https://ontology.bommaritollc.com/id/01a0f0b0-1f2c-7145-8166-1441827bcfd9)
  - [40 CFR 125.84 As an owner or operator of a new facility, what must I do to comply with this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-2004-7676-8eb0-482b6090a5e4)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd414a95f7b)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-a8e6-728f-b600-d9b642b10c17)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-6d3a-7383-8a24-cc498cae8513)
  - [evidence from https://www.govinfo.gov/link/cfr/40/125?sectionnum=86&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-e746-7215-9c25-8ca9979c672d)
- `schema:isPartOf`: [40 CFR Part 125, Subpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act](https://ontology.bommaritollc.com/id/01a0f0af-bbaa-7565-9d8a-423aed43c323)
- `schema:legislationIdentifier`: 40 CFR 125.86
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/125?sectionnum=86&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/125?sectionnum=86&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/125?sectionnum=86&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (4; `eli:cites`):
  - [40 CFR 122.21 Application for a permit (applicable to State programs, see § 123.25).](https://ontology.bommaritollc.com/id/01a0f0b0-1f2c-7145-8166-1441827bcfd9)
  - [40 CFR 125.87 As an owner or operator of a new facility, must I perform monitoring?](https://ontology.bommaritollc.com/id/01a0f0b0-2008-70da-9431-029b5dae13ac)
  - [40 CFR 125.88 As an owner or operator of a new facility, must I keep records and report?](https://ontology.bommaritollc.com/id/01a0f0b0-200a-73b1-b9dc-6025d372e73f)
  - [40 CFR 125.89 As the Director, what must I do to comply with the requirements of this subpart?](https://ontology.bommaritollc.com/id/01a0f0b0-200b-748b-b98c-847d00b27801)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd)
Cite as: 40 CFR 125.86 As an owner or operator of a new facility, what must I collect and submit when I apply for my new or reissued NPDES permit?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-2007-703b-b332-3dd5b8401fbd
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
