# 40 CFR 264.192 Design and installation of new tank systems or components.

40 CFR 264.192 Design and installation of new tank systems or components., “Design and installation of new tank systems or components”, is a CFR section of [40 CFR Part 264, Subpart J—Tank Systems](https://ontology.bommaritollc.com/id/01a0f0af-bedd-70c5-98d2-f187f36bf0c8); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter I—SOLID WASTES](https://ontology.bommaritollc.com/id/01a0f0af-be61-7256-b18f-57c00100e0c0) › [40 CFR Part 264—Standards for owners and operators of hazardous waste treatment, storage, and disposal facilities](https://ontology.bommaritollc.com/id/01a0f0af-c8a3-77a7-8019-8a926fa725d7) › [40 CFR Part 264, Subpart J—Tank Systems](https://ontology.bommaritollc.com/id/01a0f0af-bedd-70c5-98d2-f187f36bf0c8)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 264.192](https://ontology.bommaritollc.com/id/01a0f0b0-3533-7751-9f54-759fc864caa2)
- `eli:cites`:
  - [40 CFR 264.18 Location standards.](https://ontology.bommaritollc.com/id/01a0f0b0-34a6-76bd-9881-3f367a35e127)
  - [40 CFR 270.11 Signatories to permit applications and reports.](https://ontology.bommaritollc.com/id/01a0f0b0-3907-76a7-87d7-ae543c537ad5)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e880b33ae42)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-ad48-7631-8f7f-a6e6c0708d4a)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-72c8-70dc-8b0b-db5461a6c65b)
  - [evidence from https://www.govinfo.gov/link/cfr/40/264?sectionnum=192&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-ead5-70ab-9baa-9f0420ff7430)
- `schema:isPartOf`: [40 CFR Part 264, Subpart J—Tank Systems](https://ontology.bommaritollc.com/id/01a0f0af-bedd-70c5-98d2-f187f36bf0c8)
- `schema:legislationIdentifier`: 40 CFR 264.192
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Design and installation of new tank systems or components
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/264?sectionnum=192&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/264?sectionnum=192&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 264.192 Design and installation of new tank systems or components.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/264?sectionnum=192&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (3; `eli:cites`):
  - [40 CFR 264.193 Containment and detection of releases.](https://ontology.bommaritollc.com/id/01a0f0b0-359c-74f5-b729-62aa1d9a0753)
  - [40 CFR 264.196 Response to leaks or spills and disposition of leaking or unfit-for-use tank systems.](https://ontology.bommaritollc.com/id/01a0f0b0-35a1-72da-8663-768a8d6660d0)
  - [40 CFR 270.16 Specific part B information requirements for tank systems.](https://ontology.bommaritollc.com/id/01a0f0b0-390d-719c-8a31-a54b2eb7d820)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a)
Cite as: 40 CFR 264.192 Design and installation of new tank systems or components.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-3531-73f2-b552-5e8988ea5c2a
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
