# 40 CFR 790.55 Modification of test standards or schedules during conduct of test.

40 CFR 790.55 Modification of test standards or schedules during conduct of test., “Modification of test standards or schedules during conduct of test”, is a CFR section of [40 CFR Part 790, Subpart C—Implementation, Enforcement, and Modification of Test Rules](https://ontology.bommaritollc.com/id/01a0f0af-c516-77f8-b27f-22fc7a30e97c); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter R—TOXIC SUBSTANCES CONTROL ACT](https://ontology.bommaritollc.com/id/01a0f0af-c437-7050-b68d-6a74ba2592cc) › [40 CFR Part 790—Procedures governing testing consent agreements and test rules](https://ontology.bommaritollc.com/id/01a0f0af-ca29-7796-8363-480bcb295b62) › [40 CFR Part 790, Subpart C—Implementation, Enforcement, and Modification of Test Rules](https://ontology.bommaritollc.com/id/01a0f0af-c516-77f8-b27f-22fc7a30e97c)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 790.55](https://ontology.bommaritollc.com/id/01a0f0b0-66be-74ec-8272-38d8115fa415)
- `eli:cites`: [40 CFR 790.5 Submission of information.](https://ontology.bommaritollc.com/id/01a0f0b0-66ad-731f-abfb-357466b7f4a2)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3feae94163be)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-b72f-7780-99dd-90c43cfd9f4e)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-87f7-72a8-a8d2-1d390707bfd4)
  - [evidence from https://www.govinfo.gov/link/cfr/40/790?sectionnum=55&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-f347-74cb-8e45-025686d863d3)
- `schema:isPartOf`: [40 CFR Part 790, Subpart C—Implementation, Enforcement, and Modification of Test Rules](https://ontology.bommaritollc.com/id/01a0f0af-c516-77f8-b27f-22fc7a30e97c)
- `schema:legislationIdentifier`: 40 CFR 790.55
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Modification of test standards or schedules during conduct of test
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/790?sectionnum=55&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/790?sectionnum=55&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 790.55 Modification of test standards or schedules during conduct of test.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/790?sectionnum=55&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (7; `eli:cites`):
  - [40 CFR 790.59 Failure to comply with a test rule.](https://ontology.bommaritollc.com/id/01a0f0b0-66be-74ec-8272-38da4cd7af9b)
  - [40 CFR 790.88 Denial of exemption application.](https://ontology.bommaritollc.com/id/01a0f0b0-66cc-7221-a665-9dc5390d4873)
  - [40 CFR 790.93 Termination of conditional exemption.](https://ontology.bommaritollc.com/id/01a0f0b0-66cf-7140-a931-ba95b8561cbe)
  - [40 CFR 799.5085 Chemical testing requirements for first group of high production volume chemicals (HPV1).](https://ontology.bommaritollc.com/id/01a0f0b0-6794-71ee-9416-cb5601821431)
  - [40 CFR 799.5087 Chemical testing requirements for second group of high production volume chemicals (HPV2).](https://ontology.bommaritollc.com/id/01a0f0b0-6796-757e-9834-2f164d7d23ab)
  - [40 CFR 799.5089 Chemical testing requirements for third group of high production volume chemicals (HPV3).](https://ontology.bommaritollc.com/id/01a0f0b0-6797-73d0-a484-f31e5c5bdeee)
  - [40 CFR 799.5115 Chemical testing requirements for certain chemicals of interest to the Occupational Safety and Health Administration.](https://ontology.bommaritollc.com/id/01a0f0b0-6799-70f1-8929-a5873957bbea)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c)
Cite as: 40 CFR 790.55 Modification of test standards or schedules during conduct of test.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-66bc-7582-a59e-3febd36e9e7c
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
