# 40 CFR 1065.110 Work inputs and outputs, accessory work, and operator demand.

40 CFR 1065.110 Work inputs and outputs, accessory work, and operator demand., “Work inputs and outputs, accessory work, and operator demand”, is a CFR section of [40 CFR Part 1065, Subpart B—Equipment Specifications](https://ontology.bommaritollc.com/id/01a0f0af-c619-70da-9b83-77d25cb861ae); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead>

Within: [Title 40—Protection of Environment](https://ontology.bommaritollc.com/id/01a0f0af-ab93-7690-8acc-6de5e51a64c2) › [40 CFR Chapter I—ENVIRONMENTAL PROTECTION AGENCY](https://ontology.bommaritollc.com/id/01a0f0af-abe5-75b3-9f43-df69d57b62ce) › [40 CFR Chapter I, Subchapter U—AIR POLLUTION CONTROLS](https://ontology.bommaritollc.com/id/01a0f0af-c54b-73db-ab0f-d9be6da01ab1) › [40 CFR Part 1065—Engine-testing procedures](https://ontology.bommaritollc.com/id/01a0f0af-ca60-77ec-b94e-4b7ee66d0648) › [40 CFR Part 1065, Subpart B—Equipment Specifications](https://ontology.bommaritollc.com/id/01a0f0af-c619-70da-9b83-77d25cb861ae)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 40 CFR 1065.110](https://ontology.bommaritollc.com/id/01a0f0b0-6d28-7398-9838-c0a4a2701ad6)
- `eli:cites`:
  - [40 CFR 1065.10 Other procedures.](https://ontology.bommaritollc.com/id/01a0f0b0-6d1f-7773-af54-22642922ba06)
  - [40 CFR 1065.512 Duty cycle generation.](https://ontology.bommaritollc.com/id/01a0f0b0-6d8f-7168-bc48-6b019f30b4c2)
  - [40 CFR 1065.514 Cycle-validation criteria for operation over specified duty cycles.](https://ontology.bommaritollc.com/id/01a0f0b0-6d90-77ac-9279-77c94566c707)
  - [40 CFR 1065.1001 Definitions.](https://ontology.bommaritollc.com/id/01a0f0b0-6ded-7617-b601-d559ea39b1c9)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title40-vol1](https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fd3da2e691)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b0-b86d-701c-9a8b-ffe37f44f278)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-8b21-72cb-bc9d-b56a46153b09)
  - [evidence from https://www.govinfo.gov/link/cfr/40/1065?sectionnum=110&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f17-f461-70c5-b64c-ad8a7e9c4889)
- `schema:isPartOf`: [40 CFR Part 1065, Subpart B—Equipment Specifications](https://ontology.bommaritollc.com/id/01a0f0af-c619-70da-9b83-77d25cb861ae)
- `schema:legislationIdentifier`: 40 CFR 1065.110
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: Work inputs and outputs, accessory work, and operator demand
- `schema:url`: [https://www.govinfo.gov/link/cfr/40/1065?sectionnum=110&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/40/1065?sectionnum=110&year=mostrecent&link-type=details)
- `skos:prefLabel`: 40 CFR 1065.110 Work inputs and outputs, accessory work, and operator demand.

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/40/1065?sectionnum=110&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title40-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (7; `eli:cites`):
  - [40 CFR 1036.545 Powertrain testing.](https://ontology.bommaritollc.com/id/01a0f0b0-6919-7040-8778-8dc4aa73a375)
  - [40 CFR 1037.555 Special procedures for testing Phase 1 hybrid systems.](https://ontology.bommaritollc.com/id/01a0f0b0-6984-7416-ba34-e0dff9e74c78)
  - [40 CFR 1065.1001 Definitions.](https://ontology.bommaritollc.com/id/01a0f0b0-6ded-7617-b601-d559ea39b1c9)
  - [40 CFR 1065.122 Engine cooling and lubrication.](https://ontology.bommaritollc.com/id/01a0f0b0-6d29-76c8-9b4c-dc2b80ee89ed)
  - [40 CFR 1065.405 Test engine preparation and maintenance.](https://ontology.bommaritollc.com/id/01a0f0b0-6d88-70cb-836b-d5ed6ed97060)
  - [40 CFR 1065.510 Engine mapping.](https://ontology.bommaritollc.com/id/01a0f0b0-6d8f-7168-bc48-6af3edd1e1c1)
  - [40 CFR 1065.650 Emission calculations.](https://ontology.bommaritollc.com/id/01a0f0b0-6db2-7102-b981-ebce7f02009a)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead)
Cite as: 40 CFR 1065.110 Work inputs and outputs, accessory work, and operator demand.. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b0-6d26-761a-8a9c-28fedb460ead
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
