# 43 CFR Part 404, Subpart D—Feasibility Studies

43 CFR Part 404, Subpart D—Feasibility Studies, “Feasibility Studies”, is a CFR division of [43 CFR Part 404—Reclamation Rural Water Supply Program](https://ontology.bommaritollc.com/id/01a0f0b6-2799-777f-87f4-8c3f84eb7046).

IRI: <https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2>

Within: [Title 43—Public Lands: Interior](https://ontology.bommaritollc.com/id/01a0f0b6-2164-74f4-94ff-658e41b0c580) › [43 CFR Subtitle B—Regulations Relating to Public Lands](https://ontology.bommaritollc.com/id/01a0f0b6-22ff-71b4-adae-c3f121449495) › [43 CFR Chapter I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f0b6-2301-748e-9d58-74a7e92f26da) › [43 CFR Part 404—Reclamation Rural Water Supply Program](https://ontology.bommaritollc.com/id/01a0f0b6-2799-777f-87f4-8c3f84eb7046)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-division 43 CFR Part 404, Subpart D](https://ontology.bommaritollc.com/id/01a0f0b6-230a-7534-b621-33bd18cd235a)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title43-vol1](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac462a09fbed)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b6-4eab-7190-b7f4-467f4cd5bfff)
- `schema:isPartOf`: [43 CFR Part 404—Reclamation Rural Water Supply Program](https://ontology.bommaritollc.com/id/01a0f0b6-2799-777f-87f4-8c3f84eb7046)
- `schema:legislationIdentifier`: 43 CFR Part 404, Subpart D
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationType`: [CFR division](https://ontology.bommaritollc.com/vocab/leg/cfrDivision)
- `schema:name`: Feasibility Studies
- `skos:prefLabel`: 43 CFR Part 404, Subpart D—Feasibility Studies

## Elsewhere

- [Source](https://www.govinfo.gov/app/details/CFR-2025-title43-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (6; `schema:isPartOf`):
  - [43 CFR 404.47 How will a feasibility study be conducted under this program?](https://ontology.bommaritollc.com/id/01a0f0b6-33f3-72fe-a545-a2eb94562b25)
  - [43 CFR 404.48 What process will Reclamation follow to determine if a feasibility study is ready for review?](https://ontology.bommaritollc.com/id/01a0f0b6-33f4-7679-983a-b390046e4770)
  - [43 CFR 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada)
  - [43 CFR 404.50 What information will be included in the feasibility report prepared by Reclamation.](https://ontology.bommaritollc.com/id/01a0f0b6-33f7-7417-8123-565dacc01464)
  - [43 CFR 404.51 Are proposed projects under the Rural Water Supply Program reviewed by the Administration?](https://ontology.bommaritollc.com/id/01a0f0b6-33f9-77ea-a96b-87ede325f887)
  - [43 CFR 404.52 Who will the feasibility report be provided to?](https://ontology.bommaritollc.com/id/01a0f0b6-33fa-7048-a87d-bcf2784e043f)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2)
Cite as: 43 CFR Part 404, Subpart D—Feasibility Studies. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
