# 43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit

43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit, “Drilling Operations: Getting a Permit”, is a CFR division of [43 CFR Part 3200—Geothermal resource leasing](https://ontology.bommaritollc.com/id/01a0f0b6-280c-737e-9898-97c5de76f118).

IRI: <https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a>

Within: [Title 43—Public Lands: Interior](https://ontology.bommaritollc.com/id/01a0f0b6-2164-74f4-94ff-658e41b0c580) › [43 CFR Subtitle B—Regulations Relating to Public Lands](https://ontology.bommaritollc.com/id/01a0f0b6-22ff-71b4-adae-c3f121449495) › [43 CFR Chapter II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f0b6-2332-7127-bc6d-d2a7b11eacff) › [43 CFR Chapter II, Subchapter C—MINERALS MANAGEMENT (3000)](https://ontology.bommaritollc.com/id/01a0f0b6-23f6-773d-b66f-eeb410b94261) › [43 CFR Part 3200—Geothermal resource leasing](https://ontology.bommaritollc.com/id/01a0f0b6-280c-737e-9898-97c5de76f118)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-division 43 CFR Part 3200, Subpart 3261](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1423a0caed18)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title43-vol1](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1417ebb1efc3)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b6-4f11-77d9-a78f-e997e883dbc7)
- `schema:isPartOf`: [43 CFR Part 3200—Geothermal resource leasing](https://ontology.bommaritollc.com/id/01a0f0b6-280c-737e-9898-97c5de76f118)
- `schema:legislationIdentifier`: 43 CFR Part 3200, Subpart 3261
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationType`: [CFR division](https://ontology.bommaritollc.com/vocab/leg/cfrDivision)
- `schema:name`: Drilling Operations: Getting a Permit
- `skos:prefLabel`: 43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit

## Elsewhere

- [Source](https://www.govinfo.gov/app/details/CFR-2025-title43-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Parts (13; `schema:isPartOf`):
  - [43 CFR 3261.10 How do I get approval to begin well pad construction?](https://ontology.bommaritollc.com/id/01a0f0b6-414b-721e-8fda-18e685681a46)
  - [43 CFR 3261.11 How do I apply for approval of drilling operations and well pad construction?](https://ontology.bommaritollc.com/id/01a0f0b6-414c-7278-9ad5-fb7122bf3198)
  - [43 CFR 3261.12 What is an operations plan?](https://ontology.bommaritollc.com/id/01a0f0b6-414d-70ca-8760-ad218679d344)
  - [43 CFR 3261.13 What is a drilling program and how do I apply for drilling program approval?](https://ontology.bommaritollc.com/id/01a0f0b6-414f-77d4-9b17-e8689d1ac3c9)
  - [43 CFR 3261.14 When must I give BLM my operations plan?](https://ontology.bommaritollc.com/id/01a0f0b6-4150-7799-be4c-4a8c9a72b9a9)
  - [43 CFR 3261.15 Must I give BLM my drilling permit application, drilling program, and operations plan at the same time?](https://ontology.bommaritollc.com/id/01a0f0b6-4151-72c2-92cc-10ad902b63c7)
  - [43 CFR 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well?](https://ontology.bommaritollc.com/id/01a0f0b6-4152-75af-9562-ce704cb4d272)
  - [43 CFR 3261.17 How do I amend my operations plan or drilling permit?](https://ontology.bommaritollc.com/id/01a0f0b6-4154-7136-b534-43d953f858b5)
  - [43 CFR 3261.18 Do I need to file a bond with BLM before I build a well pad or drill a well?](https://ontology.bommaritollc.com/id/01a0f0b6-4155-75cb-96ae-67d3d865a89c)
  - [43 CFR 3261.19 When will BLM release my bond?](https://ontology.bommaritollc.com/id/01a0f0b6-4156-7652-a34a-c4d00a8d3f4d)
  - [43 CFR 3261.20 How will BLM review applications submitted under this subpart and notify me of its decision?](https://ontology.bommaritollc.com/id/01a0f0b6-4156-7652-a34a-c4ddba650236)
  - [43 CFR 3261.21 How do I get approval to change an approved drilling operation?](https://ontology.bommaritollc.com/id/01a0f0b6-4158-70df-81dd-b40707c7068b)
  - [43 CFR 3261.22 How do I get approval for subsequent well operations?](https://ontology.bommaritollc.com/id/01a0f0b6-4159-7686-a736-6c947b8a2cff)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a)
Cite as: 43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
