Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
43 CFR Part 3200, Subpart 3275—Conducting Utilization Operations
43 CFR Part 3200, Subpart 3275—Conducting Utilization Operations, “Conducting Utilization Operations”, is a CFR division of 43 CFR Part 3200—Geothermal resource leasing.
https://ontology.bommaritollc.com/id/01a0f0b6-24f0-76bb-847d-1822eb9471ea
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 43 CFR Part 3200, Subpart 3275 |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Conducting Utilization Operationsen |
| skos:prefLabel | 43 CFR Part 3200, Subpart 3275—Conducting Utilization Operationsen |
Related
Parts (12)schema:isPartOf
- 43 CFR 3275.10 How do I change my operations if I have an approved facility construction or commercial use permit?
- 43 CFR 3275.11 What are a facility operator's obligations?
- 43 CFR 3275.12 What environmental and safety requirements apply to facility operations?
- 43 CFR 3275.13 How must the facility operator measure the geothermal resources?
- 43 CFR 3275.14 What aspects of my geothermal operations must I measure?
- 43 CFR 3275.15 How accurately must I measure my production and utilization?
- 43 CFR 3275.16 What standards apply to installing and maintaining meters?
- 43 CFR 3275.17 What must I do if I find an error in a meter?
- 43 CFR 3275.18 May BLM require me to test for byproducts associated with geothermal resource production?
- 43 CFR 3275.19 How do I apply to commingle production?
- 43 CFR 3275.20 What will BLM do if I waste geothermal resources?
- 43 CFR 3275.21 May BLM order me to drill and produce wells on my lease?